Solar power plant, Mississippi
Sunflower County solar power plant, Mississippi
Sunflower County is a 100 MW solar power plant in Sunflower County, Mississippi, operated by Sunflower County Solar Project, LLC, and it generated 154,825 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Mississippi, and its capacity factor sits at the 16th percentile of U.S. solar plants. By 2025 generation it ranks 2,852nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Sunflower County plant run compared with other solar plants?
The Sunflower County plant had a capacity factor of 18% in 2025 on 100 MW of net summer capacity, the 16th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 65 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Sunflower County | 18% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Sunflower County plant generating more or less than last year?
Sunflower County generated 154,825 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 5.7% behind the same months of 2025. 2024 has output for only 10 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 107,076 |
| 2025 | 154,825 |
| 2026 through August | 112,744 |
| 2025, same months | 119,500 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 17,998 |
| July 2026 | 14,665 |
| June 2026 | 15,943 |
| May 2026 | 16,177 |
| April 2026 | 14,005 |
| March 2026 | 15,469 |
| February 2026 | 10,220 |
| January 2026 | 8,267 |
| December 2025 | 6,341 |
| November 2025 | 9,887 |
| October 2025 | 8,400 |
| September 2025 | 10,697 |
| August 2025 | 17,870 |
| July 2025 | 20,826 |
| June 2025 | 20,091 |
| May 2025 | 16,845 |
| April 2025 | 19,490 |
| March 2025 | 17,189 |
| February 2025 | 7,189 |
| January 2025 | 0 |
| December 2024 | 5,973 |
| November 2024 | 0 |
| October 2024 | 7,303 |
| September 2024 | 0 |
| August 2024 | 5,973 |
| July 2024 | 4,911 |
| June 2024 | 16,844 |
| May 2024 | 18,554 |
| April 2024 | 17,037 |
| March 2024 | 13,359 |
| February 2024 | 9,972 |
| January 2024 | 7,150 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Sunflower County plant, and when do they retire?
1 operable generator totals 100 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 100 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SUNFL | Operating | Solar Photovoltaic | 100 | 2022 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Sunflower County plant?
EIA lists no joint owners for Sunflower County. Sunflower County Solar Project, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Sunflower County plant?
Sunflower County is in Ruleville, Sunflower County, Mississippi, at 33.7578° N, 90.5365° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Mississippi are similar in size?
Mississippi has 25 operable solar plants with 1,524 MW of capacity, and Sunflower County's 100 MW is 7% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Golden Triangle | Lowndes | 200 | 418,711 |
| Pearl River Solar Park LLC | Scott | 175 | 418,916 |
| Golden Triangle II | Lowndes | 150 | 325,338 |
| Sunflower County | Sunflower | 100 | 154,825 |
| Ragsdale Solar LLC | Madison | 100 | 238,898 |
| Wildflower Solar, LLC (MS) | DeSoto | 100 | 201,326 |
| Delta's Edge Solar | Carroll | 100 | 114,290 |
Source: EIA Forms EIA-860 and EIA-923, 2025.