Skip to main content
RateWatt

Solar power plant, Mississippi

Golden Triangle solar power plant, Mississippi

Golden Triangle is a 250 MW power plant, 200 MW of it solar, in Lowndes County, Mississippi, operated by Origis Energy USA, Inc, and it generated 411,833 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Mississippi, and its capacity factor sits at the 57th percentile of U.S. solar plants. By 2025 generation it ranks 1,553rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

250 MWNameplate capacity
24%Capacity factor, 2025, solar units, 57th percentile, on 200 MW net summer
0.5%Of MS generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the Golden Triangle plant run compared with other solar plants?

The Golden Triangle plant's solar units had a capacity factor of 24% in 2025 on 200 MW of net summer capacity, the 57th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 87 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Golden Triangle24%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Golden Triangle plant generating more or less than last year?

Golden Triangle generated 411,833 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 0.7% behind the same months of 2025.

Net generation by period
PeriodMWh
2024n/a
2025411,833
2026 through August283,278
2025, same months285,311
Monthly generation, Jan 2025 to Aug 2026
MonthMWh
August 20263,391
July 202648,698
June 202645,309
May 202643,285
April 202647,075
March 202642,422
February 202629,472
January 202623,626
December 202521,065
November 202528,554
October 202534,728
September 202542,175
August 202546,981
July 202551,684
June 202542,826
May 202540,370
April 202544,723
March 202537,207
February 202520,859
January 2025661

Source: EIA Form EIA-923, through August 2026.

How much of Mississippi's electricity comes from the Golden Triangle plant?

Golden Triangle made 0.5% of the 77,727,245 MWh reported by Mississippi plants in 2025, from 1.4% of the state's 17,862 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 20th largest of 63 plants in Mississippi, the 1,239th largest of 14,327 in the U.S. and the 153rd largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 23rd largest of 57 generating plants in the state.

Golden Triangle within Mississippi, 2025
MeasureThis plantMississippiShare
Capacity (MW)25017,8621.4%
Generation (MWh)411,83377,727,2450.5%
Solar capacity (MW)2001,52413.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Golden Triangle plant, and when do they retire?

2 operable generators total 250 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2250100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
MS5_SOperatingBatteries502025n/a
OEMS5OperatingSolar Photovoltaic2002025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Golden Triangle plant?

EIA lists no joint owners for Golden Triangle. Origis Energy USA, Inc operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Golden Triangle plant use?

Golden Triangle has capacity on 2 fuels: 80% solar and 20% battery and pumped storage. In 2025, solar made 102% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar20080.0%418,711
Battery and pumped storage5020.0%-6,878

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Golden Triangle plant?

Golden Triangle is in Lowndes, Lowndes County, Mississippi, at 33.4189° N, 88.6189° W. It sits in the Tennessee Valley Authority balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Mississippi are similar in size?

Mississippi has 25 operable solar plants with 1,524 MW of capacity, and Golden Triangle's 200 MW is 13% of that.

Solar plants in Mississippi around this size
PlantCountyMW2025 MWh
Golden TriangleLowndes200418,711
Pearl River Solar Park LLCScott175418,916
Golden Triangle IILowndes150325,338
Sunflower CountySunflower100154,825

Source: EIA Forms EIA-860 and EIA-923, 2025.