Hardin Solar Energy II LLC power plant, Ohio

Hardin Solar Energy II LLC is a 150 MW solar power plant in Hardin County, Ohio, operated by Invenergy Services LLC, and it generated 328,847 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Ohio, and its capacity factor sits at the 64th percentile of U.S. solar plants. By 2025 generation it ranks 1,852nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

150 MWNameplate capacity
25%Capacity factor, 2025, 64th percentile, on 150 MW net summer
0.2%Of OH generation, 2025
1 yearAverage generator age, by MW

How hard does the Hardin Solar Energy II LLC plant run compared with other solar plants?

The Hardin Solar Energy II LLC plant had a capacity factor of 25% in 2025 on 150 MW of net summer capacity, the 64th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 91 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hardin Solar Energy II LLC25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hardin Solar Energy II LLC plant generating more or less than last year?

Hardin Solar Energy II LLC generated 328,847 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 4.9% behind the same months of 2025. 2024 has output for only 1 month, so the two years are not compared.

Net generation by period
PeriodMWh
20247,947
2025328,847
2026 through August234,067
2025, same months246,017
Monthly generation, Dec 2024 to Aug 2026
MonthMWh
August 202631,550
July 202641,050
June 202638,257
May 202635,384
April 202629,745
March 202622,420
February 202620,708
January 202614,953
December 202510,894
November 202513,904
October 202522,978
September 202535,054
August 202537,014
July 202537,791
June 202534,700
May 202531,278
April 202532,825
March 202541,439
February 202515,231
January 202515,739
December 20247,947

Source: EIA Form EIA-923, through August 2026.

How much of Ohio's electricity comes from the Hardin Solar Energy II LLC plant?

Hardin Solar Energy II LLC made 0.2% of the 145,060,499 MWh reported by Ohio plants in 2025, from 0.4% of the state's 34,392 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 41st largest of 215 plants in Ohio, the 1,967th largest of 14,327 in the U.S. and the 272nd largest of 7,223 solar plants. By 2025 generation it is the 39th largest of 187 generating plants in the state.

Hardin Solar Energy II LLC within Ohio, 2025
MeasureThis plantOhioShare
Capacity (MW)15034,3920.4%
Generation (MWh)328,847145,060,4990.2%
Solar capacity (MW)1504,4813.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hardin Solar Energy II LLC plant, and when do they retire?

1 operable generator totals 150 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingSolar Photovoltaic1502024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hardin Solar Energy II LLC plant?

EIA lists no joint owners for Hardin Solar Energy II LLC. Invenergy Services LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Hardin Solar Energy II LLC plant?

Hardin Solar Energy II LLC is in Belle Center, Hardin County, Ohio, at 40.6325° N, 83.7924° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Ohio are similar in size?

Ohio has 73 operable solar plants with 4,481 MW of capacity, and Hardin Solar Energy II LLC's 150 MW is 3% of that.

Solar plants in Ohio around this size
PlantCountyMW2025 MWh
Big Plain Solar, LLCMadison196391,367
Madison Fields Solar Project, LLCMadison180380,956
Hardin Solar Energy LLCHardin150291,484
Hardin Solar Energy II LLCHardin150328,847
Willowbrook Solar I, LLCHighland150278,888
Powell Creek SolarPutnam150219,815
Clearview Solar 1Champaign144282,274

Source: EIA Forms EIA-860 and EIA-923, 2025.