Solar power plant, Ohio
Hardin Solar Energy II LLC power plant, Ohio
Hardin Solar Energy II LLC is a 150 MW solar power plant in Hardin County, Ohio, operated by Invenergy Services LLC, and it generated 328,847 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Ohio, and its capacity factor sits at the 64th percentile of U.S. solar plants. By 2025 generation it ranks 1,852nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Hardin Solar Energy II LLC plant run compared with other solar plants?
The Hardin Solar Energy II LLC plant had a capacity factor of 25% in 2025 on 150 MW of net summer capacity, the 64th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 91 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Hardin Solar Energy II LLC | 25% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Hardin Solar Energy II LLC plant generating more or less than last year?
Hardin Solar Energy II LLC generated 328,847 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 4.9% behind the same months of 2025. 2024 has output for only 1 month, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 7,947 |
| 2025 | 328,847 |
| 2026 through August | 234,067 |
| 2025, same months | 246,017 |
Monthly generation, Dec 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 31,550 |
| July 2026 | 41,050 |
| June 2026 | 38,257 |
| May 2026 | 35,384 |
| April 2026 | 29,745 |
| March 2026 | 22,420 |
| February 2026 | 20,708 |
| January 2026 | 14,953 |
| December 2025 | 10,894 |
| November 2025 | 13,904 |
| October 2025 | 22,978 |
| September 2025 | 35,054 |
| August 2025 | 37,014 |
| July 2025 | 37,791 |
| June 2025 | 34,700 |
| May 2025 | 31,278 |
| April 2025 | 32,825 |
| March 2025 | 41,439 |
| February 2025 | 15,231 |
| January 2025 | 15,739 |
| December 2024 | 7,947 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Hardin Solar Energy II LLC plant, and when do they retire?
1 operable generator totals 150 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 150 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Solar Photovoltaic | 150 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Hardin Solar Energy II LLC plant?
EIA lists no joint owners for Hardin Solar Energy II LLC. Invenergy Services LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Hardin Solar Energy II LLC plant?
Hardin Solar Energy II LLC is in Belle Center, Hardin County, Ohio, at 40.6325° N, 83.7924° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Ohio are similar in size?
Ohio has 73 operable solar plants with 4,481 MW of capacity, and Hardin Solar Energy II LLC's 150 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Big Plain Solar, LLC | Madison | 196 | 391,367 |
| Madison Fields Solar Project, LLC | Madison | 180 | 380,956 |
| Hardin Solar Energy LLC | Hardin | 150 | 291,484 |
| Hardin Solar Energy II LLC | Hardin | 150 | 328,847 |
| Willowbrook Solar I, LLC | Highland | 150 | 278,888 |
| Powell Creek Solar | Putnam | 150 | 219,815 |
| Clearview Solar 1 | Champaign | 144 | 282,274 |
Source: EIA Forms EIA-860 and EIA-923, 2025.