Solar power plant, Ohio
Madison Fields Solar Project, LLC power plant, Ohio
Madison Fields Solar Project, LLC is a 180 MW solar power plant in Madison County, Ohio, operated by Madison Fields Solar Project, LLC, and it generated 380,956 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Ohio, and its capacity factor sits at the 58th percentile of U.S. solar plants. By 2025 generation it ranks 1,649th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Madison Fields Solar Project, LLC plant run compared with other solar plants?
The Madison Fields Solar Project, LLC plant had a capacity factor of 24% in 2025 on 180 MW of net summer capacity, the 58th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 88 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Madison Fields Solar Project, LLC | 24% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Madison Fields Solar Project, LLC plant generating more or less than last year?
Generation at Madison Fields Solar Project, LLC rose 2.8% from 2024 to 2025, from 370,562 MWh to 380,956 MWh. Through August 2026 it is running 1.1% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 370,562 |
| 2025 | 380,956 |
| 2026 through August | 282,418 |
| 2025, same months | 279,427 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 36,113 |
| July 2026 | 46,926 |
| June 2026 | 45,599 |
| May 2026 | 41,905 |
| April 2026 | 38,997 |
| March 2026 | 29,201 |
| February 2026 | 25,595 |
| January 2026 | 18,082 |
| December 2025 | 11,847 |
| November 2025 | 17,352 |
| October 2025 | 30,723 |
| September 2025 | 41,607 |
| August 2025 | 47,743 |
| July 2025 | 46,963 |
| June 2025 | 43,381 |
| May 2025 | 36,432 |
| April 2025 | 36,009 |
| March 2025 | 31,713 |
| February 2025 | 17,587 |
| January 2025 | 19,599 |
| December 2024 | 11,732 |
| November 2024 | 14,206 |
| October 2024 | 34,480 |
| September 2024 | 35,793 |
| August 2024 | 45,105 |
| July 2024 | 48,021 |
| June 2024 | 45,294 |
| May 2024 | 41,837 |
| April 2024 | 34,089 |
| March 2024 | 24,621 |
| February 2024 | 26,448 |
| January 2024 | 8,936 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Madison Fields Solar Project, LLC plant, and when do they retire?
1 operable generator totals 180 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 180 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| USMDF | Operating | Solar Photovoltaic | 180 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Madison Fields Solar Project, LLC plant?
EIA lists no joint owners for Madison Fields Solar Project, LLC. Madison Fields Solar Project, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Madison Fields Solar Project, LLC plant?
Madison Fields Solar Project, LLC is in Irwin, Madison County, Ohio, at 40.0971° N, 83.4687° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Ohio are similar in size?
Ohio has 73 operable solar plants with 4,481 MW of capacity, and Madison Fields Solar Project, LLC's 180 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Hardin Solar III | Hardin | 250 | 470,630 |
| Hillcrest Solar | Brown | 200 | 362,127 |
| Big Plain Solar, LLC | Madison | 196 | 391,367 |
| Madison Fields Solar Project, LLC | Madison | 180 | 380,956 |
| Hardin Solar Energy LLC | Hardin | 150 | 291,484 |
| Hardin Solar Energy II LLC | Hardin | 150 | 328,847 |
| Willowbrook Solar I, LLC | Highland | 150 | 278,888 |
Source: EIA Forms EIA-860 and EIA-923, 2025.