Solar power plant, Ohio

Hardin Solar III power plant, Ohio

Hardin Solar III is a 250 MW solar power plant in Hardin County, Ohio, operated by Hardin Solar Energy III, and it generated 470,630 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Ohio, and its capacity factor sits at the 37th percentile of U.S. solar plants. By 2025 generation it ranks 1,403rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

250 MWNameplate capacity
21%Capacity factor, 2025, 37th percentile, on 250 MW net summer
0.3%Of OH generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the Hardin Solar III plant run compared with other solar plants?

The Hardin Solar III plant had a capacity factor of 21% in 2025 on 250 MW of net summer capacity, the 37th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 78 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hardin Solar III21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hardin Solar III plant generating more or less than last year?

Hardin Solar III generated 470,630 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 17.9% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024n/a
2025470,630
2026 through August392,140
2025, same months332,663
Monthly generation, Mar 2025 to Aug 2026
MonthMWh
August 202654,448
July 202669,595
June 202662,858
May 202658,965
April 202649,197
March 202637,974
February 202634,459
January 202624,644
December 202518,677
November 202520,682
October 202540,467
September 202558,141
August 202566,399
July 202564,291
June 202559,138
May 202551,790
April 202549,673
March 202541,372

Source: EIA Form EIA-923, through August 2026.

How much of Ohio's electricity comes from the Hardin Solar III plant?

Hardin Solar III made 0.3% of the 145,060,499 MWh reported by Ohio plants in 2025, from 0.7% of the state's 34,392 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 33rd largest of 215 plants in Ohio, the 1,239th largest of 14,327 in the U.S. and the 106th largest of 7,223 solar plants. By 2025 generation it is the 32nd largest of 187 generating plants in the state.

Hardin Solar III within Ohio, 2025
MeasureThis plantOhioShare
Capacity (MW)25034,3920.7%
Generation (MWh)470,630145,060,4990.3%
Solar capacity (MW)2504,4815.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hardin Solar III plant, and when do they retire?

1 operable generator totals 250 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1250100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
HARD3OperatingSolar Photovoltaic2502025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hardin Solar III plant?

EIA lists no joint owners for Hardin Solar III. Hardin Solar Energy III operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Hardin Solar III plant?

Hardin Solar III is in Alger, Hardin County, Ohio, at 40.6823° N, 83.7939° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Ohio are similar in size?

Ohio has 73 operable solar plants with 4,481 MW of capacity, and Hardin Solar III's 250 MW is 6% of that.

Solar plants in Ohio around this size
PlantCountyMW2025 MWh
AEUG Union Solar, LLCUnion325657,815
Hecate Energy Highland LLCHighland300604,259
Yellowbud Solar, LLCRoss274503,703
Hardin Solar IIIHardin250470,630
Hillcrest SolarBrown200362,127
Big Plain Solar, LLCMadison196391,367
Madison Fields Solar Project, LLCMadison180380,956

Source: EIA Forms EIA-860 and EIA-923, 2025.