Hecate Energy Highland LLC solar power plant, Ohio

Hecate Energy Highland LLC is a 300 MW solar power plant in Highland County, Ohio, operated by Hecate Energy Highland LLC, and it generated 604,259 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Ohio, and its capacity factor sits at the 49th percentile of U.S. solar plants. By 2025 generation it ranks 1,121st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

300 MWNameplate capacity
23%Capacity factor, 2025, 49th percentile, on 300 MW net summer
0.4%Of OH generation, 2025
1 yearAverage generator age, by MW

How hard does the Hecate Energy Highland LLC plant run compared with other solar plants?

The Hecate Energy Highland LLC plant had a capacity factor of 23% in 2025 on 300 MW of net summer capacity, the 49th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 84 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hecate Energy Highland LLC23%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hecate Energy Highland LLC plant generating more or less than last year?

Hecate Energy Highland LLC generated 604,259 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 5.0% ahead of the same months of 2025. 2024 has output for only 8 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024349,911
2025604,259
2026 through August476,124
2025, same months453,445
Monthly generation, May 2024 to Aug 2026
MonthMWh
August 202665,268
July 202676,343
June 202672,541
May 202669,991
April 202669,233
March 202653,217
February 202638,668
January 202630,863
December 202515,155
November 202525,653
October 202550,650
September 202559,356
August 202577,701
July 202573,253
June 202565,086
May 202561,325
April 202555,990
March 202550,762
February 202535,932
January 202533,396
December 202421,659
November 202420,943
October 202446,699
September 202456,420
August 202463,794
July 202459,583
June 202465,836
May 202414,977

Source: EIA Form EIA-923, through August 2026.

How much of Ohio's electricity comes from the Hecate Energy Highland LLC plant?

Hecate Energy Highland LLC made 0.4% of the 145,060,499 MWh reported by Ohio plants in 2025, from 0.9% of the state's 34,392 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 31st largest of 215 plants in Ohio, the 1,045th largest of 14,327 in the U.S. and the 42nd largest of 7,223 solar plants. By 2025 generation it is the 28th largest of 187 generating plants in the state.

Hecate Energy Highland LLC within Ohio, 2025
MeasureThis plantOhioShare
Capacity (MW)30034,3920.9%
Generation (MWh)604,259145,060,4990.4%
Solar capacity (MW)3004,4816.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hecate Energy Highland LLC plant, and when do they retire?

1 operable generator totals 300 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1300100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
HIGHLOperatingSolar Photovoltaic3002024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hecate Energy Highland LLC plant?

EIA lists no joint owners for Hecate Energy Highland LLC. Hecate Energy Highland LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Hecate Energy Highland LLC plant?

Hecate Energy Highland LLC is in Buford, Highland County, Ohio, at 39.0835° N, 83.8098° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Ohio are similar in size?

Ohio has 73 operable solar plants with 4,481 MW of capacity, and Hecate Energy Highland LLC's 300 MW is 7% of that.

Solar plants in Ohio around this size
PlantCountyMW2025 MWh
Fox Squirrel SolarMadison5771,168,589
AEUG Union Solar, LLCUnion325657,815
Hecate Energy Highland LLCHighland300604,259
Yellowbud Solar, LLCRoss274503,703
Hardin Solar IIIHardin250470,630
Hillcrest SolarBrown200362,127

Source: EIA Forms EIA-860 and EIA-923, 2025.