Solar power plant, Ohio

Yellowbud Solar, LLC power plant, Ohio

Yellowbud Solar, LLC is a 274 MW solar power plant in Ross County, Ohio, operated by Geronimo Power, and it generated 503,703 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Ohio, and its capacity factor sits at the 32nd percentile of U.S. solar plants. By 2025 generation it ranks 1,327th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

274 MWNameplate capacity
21%Capacity factor, 2025, 32nd percentile, on 274 MW net summer
0.3%Of OH generation, 2025
2 yearsAverage generator age, by MW

How hard does the Yellowbud Solar, LLC plant run compared with other solar plants?

The Yellowbud Solar, LLC plant had a capacity factor of 21% in 2025 on 274 MW of net summer capacity, the 32nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 77 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Yellowbud Solar, LLC21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Yellowbud Solar, LLC plant generating more or less than last year?

Generation at Yellowbud Solar, LLC fell 1.6% from 2024 to 2025, from 511,692 MWh to 503,703 MWh. Through August 2026 it is running 1.3% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024511,692
2025503,703
2026 through August383,945
2025, same months378,913
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202654,069
July 202666,027
June 202660,294
May 202658,774
April 202657,049
March 202639,406
February 202629,627
January 202618,699
December 202512,026
November 202518,725
October 202540,556
September 202553,483
August 202563,007
July 202559,939
June 202562,213
May 202551,155
April 202551,136
March 202543,241
February 202523,017
January 202525,205
December 202417,962
November 202420,622
October 202444,006
September 202445,882
August 202466,277
July 202464,935
June 202459,752
May 202457,467
April 202448,376
March 202436,957
February 202435,536
January 202413,920

Source: EIA Form EIA-923, through August 2026.

How much of Ohio's electricity comes from the Yellowbud Solar, LLC plant?

Yellowbud Solar, LLC made 0.3% of the 145,060,499 MWh reported by Ohio plants in 2025, from 0.8% of the state's 34,392 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 32nd largest of 215 plants in Ohio, the 1,166th largest of 14,327 in the U.S. and the 64th largest of 7,223 solar plants. By 2025 generation it is the 31st largest of 187 generating plants in the state.

Yellowbud Solar, LLC within Ohio, 2025
MeasureThis plantOhioShare
Capacity (MW)27434,3920.8%
Generation (MWh)503,703145,060,4990.3%
Solar capacity (MW)2744,4816.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Yellowbud Solar, LLC plant, and when do they retire?

1 operable generator totals 274 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1274100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
YELLOOperatingSolar Photovoltaic2742023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Yellowbud Solar, LLC plant?

EIA lists no joint owners for Yellowbud Solar, LLC. Geronimo Power operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Yellowbud Solar, LLC plant?

Yellowbud Solar, LLC is in Williamsport, Ross County, Ohio, at 39.5025° N, 83.0656° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Ohio are similar in size?

Ohio has 73 operable solar plants with 4,481 MW of capacity, and Yellowbud Solar, LLC's 274 MW is 6% of that.

Solar plants in Ohio around this size
PlantCountyMW2025 MWh
AEUG Union Solar, LLCUnion325657,815
Hecate Energy Highland LLCHighland300604,259
Yellowbud Solar, LLCRoss274503,703
Hardin Solar IIIHardin250470,630
Hillcrest SolarBrown200362,127
Big Plain Solar, LLCMadison196391,367

Source: EIA Forms EIA-860 and EIA-923, 2025.