Clearview Solar 1 power plant, Ohio

Clearview Solar 1 is a 144 MW solar power plant in Champaign County, Ohio, operated by Clearview Solar I, LLC, and it generated 282,274 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Ohio, and its capacity factor sits at the 44th percentile of U.S. solar plants. By 2025 generation it ranks 2,054th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

144 MWNameplate capacity
22%Capacity factor, 2025, 44th percentile, on 144 MW net summer
0.2%Of OH generation, 2025
1 yearAverage generator age, by MW

How hard does the Clearview Solar 1 plant run compared with other solar plants?

The Clearview Solar 1 plant had a capacity factor of 22% in 2025 on 144 MW of net summer capacity, the 44th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 82 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Clearview Solar 122%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Clearview Solar 1 plant generating more or less than last year?

Clearview Solar 1 generated 282,274 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 5.2% ahead of the same months of 2025. 2024 has output for only 1 month, so the two years are not compared.

Net generation by period
PeriodMWh
2024258
2025282,274
2026 through August211,624
2025, same months201,090
Monthly generation, Dec 2024 to Aug 2026
MonthMWh
August 202630,287
July 202638,723
June 202635,584
May 202633,519
April 202629,400
March 202613,084
February 202618,033
January 202612,994
December 20259,657
November 202513,938
October 202524,502
September 202533,087
August 202535,913
July 202531,833
June 202524,979
May 202529,161
April 202527,852
March 202524,113
February 202513,558
January 202513,681
December 2024258

Source: EIA Form EIA-923, through August 2026.

How much of Ohio's electricity comes from the Clearview Solar 1 plant?

Clearview Solar 1 made 0.2% of the 145,060,499 MWh reported by Ohio plants in 2025, from 0.4% of the state's 34,392 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 45th largest of 215 plants in Ohio, the 2,112th largest of 14,327 in the U.S. and the 323rd largest of 7,223 solar plants. By 2025 generation it is the 48th largest of 187 generating plants in the state.

Clearview Solar 1 within Ohio, 2025
MeasureThis plantOhioShare
Capacity (MW)14434,3920.4%
Generation (MWh)282,274145,060,4990.2%
Solar capacity (MW)1444,4813.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Clearview Solar 1 plant, and when do they retire?

1 operable generator totals 144 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1144100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CLV1OperatingSolar Photovoltaic1442024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Clearview Solar 1 plant?

EIA lists no joint owners for Clearview Solar 1. Clearview Solar I, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Clearview Solar 1 plant?

Clearview Solar 1 is in Quincy, Champaign County, Ohio, at 40.2692° N, 83.9841° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Ohio are similar in size?

Ohio has 73 operable solar plants with 4,481 MW of capacity, and Clearview Solar 1's 144 MW is 3% of that.

Solar plants in Ohio around this size
PlantCountyMW2025 MWh
Hardin Solar Energy II LLCHardin150328,847
Willowbrook Solar I, LLCHighland150278,888
Powell Creek SolarPutnam150219,815
Clearview Solar 1Champaign144282,274
Wheatsborough SolarErie12586,073
Ross County Solar, LLCRoss120218,630
Dodson Creek Solar, LLCHighland117166,013

Source: EIA Forms EIA-860 and EIA-923, 2025.