Clearview Solar 1 is a 144 MW solar power plant in Champaign County, Ohio, operated by Clearview Solar I, LLC, and it generated 282,274 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Ohio, and its capacity factor sits at the 44th percentile of U.S. solar plants. By 2025 generation it ranks 2,054th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Clearview Solar 1 plant run compared with other solar plants?
The Clearview Solar 1 plant had a capacity factor of 22% in 2025 on 144 MW of net summer capacity, the 44th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 82 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Clearview Solar 1 | 22% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Clearview Solar 1 plant generating more or less than last year?
Clearview Solar 1 generated 282,274 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 5.2% ahead of the same months of 2025. 2024 has output for only 1 month, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 258 |
| 2025 | 282,274 |
| 2026 through August | 211,624 |
| 2025, same months | 201,090 |
Monthly generation, Dec 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 30,287 |
| July 2026 | 38,723 |
| June 2026 | 35,584 |
| May 2026 | 33,519 |
| April 2026 | 29,400 |
| March 2026 | 13,084 |
| February 2026 | 18,033 |
| January 2026 | 12,994 |
| December 2025 | 9,657 |
| November 2025 | 13,938 |
| October 2025 | 24,502 |
| September 2025 | 33,087 |
| August 2025 | 35,913 |
| July 2025 | 31,833 |
| June 2025 | 24,979 |
| May 2025 | 29,161 |
| April 2025 | 27,852 |
| March 2025 | 24,113 |
| February 2025 | 13,558 |
| January 2025 | 13,681 |
| December 2024 | 258 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Clearview Solar 1 plant, and when do they retire?
1 operable generator totals 144 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 144 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CLV1 | Operating | Solar Photovoltaic | 144 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Clearview Solar 1 plant?
EIA lists no joint owners for Clearview Solar 1. Clearview Solar I, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Clearview Solar 1 plant?
Clearview Solar 1 is in Quincy, Champaign County, Ohio, at 40.2692° N, 83.9841° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Ohio are similar in size?
Ohio has 73 operable solar plants with 4,481 MW of capacity, and Clearview Solar 1's 144 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Hardin Solar Energy II LLC | Hardin | 150 | 328,847 |
| Willowbrook Solar I, LLC | Highland | 150 | 278,888 |
| Powell Creek Solar | Putnam | 150 | 219,815 |
| Clearview Solar 1 | Champaign | 144 | 282,274 |
| Wheatsborough Solar | Erie | 125 | 86,073 |
| Ross County Solar, LLC | Ross | 120 | 218,630 |
| Dodson Creek Solar, LLC | Highland | 117 | 166,013 |
Source: EIA Forms EIA-860 and EIA-923, 2025.