Dodson Creek Solar, LLC is a 117 MW solar power plant in Highland County, Ohio, operated by Geronimo Power, and it generated 166,013 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Ohio, and its capacity factor sits at the 13th percentile of U.S. solar plants. By 2025 generation it ranks 2,753rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Dodson Creek Solar, LLC plant run compared with other solar plants?
The Dodson Creek Solar, LLC plant had a capacity factor of 16% in 2025 on 117 MW of net summer capacity, the 13th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 59 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Dodson Creek Solar, LLC | 16% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Dodson Creek Solar, LLC plant generating more or less than last year?
Dodson Creek Solar, LLC generated 166,013 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 58.2% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 166,013 |
| 2026 through August | 173,459 |
| 2025, same months | 109,643 |
Monthly generation, Apr 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 24,661 |
| July 2026 | 29,653 |
| June 2026 | 27,024 |
| May 2026 | 25,793 |
| April 2026 | 24,828 |
| March 2026 | 18,314 |
| February 2026 | 13,195 |
| January 2026 | 9,991 |
| December 2025 | 5,938 |
| November 2025 | 9,078 |
| October 2025 | 18,080 |
| September 2025 | 23,274 |
| August 2025 | 29,354 |
| July 2025 | 27,880 |
| June 2025 | 24,798 |
| May 2025 | 20,565 |
| April 2025 | 7,046 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Dodson Creek Solar, LLC plant, and when do they retire?
1 operable generator totals 117 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 117 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| DODSN | Operating | Solar Photovoltaic | 117 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Dodson Creek Solar, LLC plant?
EIA lists no joint owners for Dodson Creek Solar, LLC. Geronimo Power operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Dodson Creek Solar, LLC plant?
Dodson Creek Solar, LLC is in Hillsboro, Highland County, Ohio, at 39.1815° N, 83.7675° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Ohio are similar in size?
Ohio has 73 operable solar plants with 4,481 MW of capacity, and Dodson Creek Solar, LLC's 117 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Clearview Solar 1 | Champaign | 144 | 282,274 |
| Wheatsborough Solar | Erie | 125 | 86,073 |
| Ross County Solar, LLC | Ross | 120 | 218,630 |
| Dodson Creek Solar, LLC | Highland | 117 | 166,013 |
| Sycamore Creek Solar, LLC | Crawford | 117 | 23,600 |
| Arche Energy Project, LLC | Fulton | 107 | 192,647 |
| New Market Solar | Highland | 100 | 200,969 |