Solar power plant, Ohio
Sycamore Creek Solar, LLC power plant, Ohio
Sycamore Creek Solar, LLC is a 117 MW solar power plant in Crawford County, Ohio, operated by Geronimo Power, and it generated 23,600 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 3rd percentile of U.S. solar plants. By 2025 generation it ranks 5,035th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Sycamore Creek Solar, LLC plant run compared with other solar plants?
The Sycamore Creek Solar, LLC plant had a capacity factor of 2% in 2025 on 117 MW of net summer capacity, the 3rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 8 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Sycamore Creek Solar, LLC | 2% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Sycamore Creek Solar, LLC plant generating more or less than last year?
Sycamore Creek Solar, LLC generated 23,600 MWh in 2025; EIA reports no 2024 total to compare.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 23,600 |
| 2026 through August | 164,300 |
Monthly generation, Oct 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 22,605 |
| July 2026 | 29,604 |
| June 2026 | 29,096 |
| May 2026 | 25,380 |
| April 2026 | 19,376 |
| March 2026 | 15,613 |
| February 2026 | 13,216 |
| January 2026 | 9,410 |
| December 2025 | 6,798 |
| November 2025 | 3,599 |
| October 2025 | 13,203 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Sycamore Creek Solar, LLC plant, and when do they retire?
1 operable generator totals 117 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 117 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SYCSL | Operating | Solar Photovoltaic | 117 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Sycamore Creek Solar, LLC plant?
EIA lists no joint owners for Sycamore Creek Solar, LLC. Geronimo Power operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Sycamore Creek Solar, LLC plant?
Sycamore Creek Solar, LLC is in New Washington, Crawford County, Ohio, at 40.9530° N, 82.8590° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Ohio are similar in size?
Ohio has 73 operable solar plants with 4,481 MW of capacity, and Sycamore Creek Solar, LLC's 117 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Wheatsborough Solar | Erie | 125 | 86,073 |
| Ross County Solar, LLC | Ross | 120 | 218,630 |
| Dodson Creek Solar, LLC | Highland | 117 | 166,013 |
| Sycamore Creek Solar, LLC | Crawford | 117 | 23,600 |
| Arche Energy Project, LLC | Fulton | 107 | 192,647 |
| New Market Solar | Highland | 100 | 200,969 |
| Buckeye Solar | Pickaway | 100 | 191,713 |
Source: EIA Forms EIA-860 and EIA-923, 2025.