Solar power plant, Utah
Hornshadow Solar II, LLC power plant, Utah
Hornshadow Solar II, LLC is a 200 MW solar power plant in Emery County, Utah, operated by Hornshadow Solar II, LLC, and it generated 227,612 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Utah, and its capacity factor sits at the 9th percentile of U.S. solar plants. By 2025 generation it ranks 2,330th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Hornshadow Solar II, LLC plant run compared with other solar plants?
The Hornshadow Solar II, LLC plant had a capacity factor of 13% in 2025 on 200 MW of net summer capacity, the 9th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 47 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Hornshadow Solar II, LLC | 13% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Hornshadow Solar II, LLC plant generating more or less than last year?
Hornshadow Solar II, LLC generated 227,612 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 218.2% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 227,612 |
| 2026 through August | 324,641 |
| 2025, same months | 102,033 |
Monthly generation, Jul 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 41,563 |
| July 2026 | 54,326 |
| June 2026 | 56,815 |
| May 2026 | 49,853 |
| April 2026 | 46,656 |
| March 2026 | 43,026 |
| February 2026 | 26,560 |
| January 2026 | 5,842 |
| December 2025 | 20,416 |
| November 2025 | 24,097 |
| October 2025 | 37,440 |
| September 2025 | 43,626 |
| August 2025 | 51,163 |
| July 2025 | 50,870 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Hornshadow Solar II, LLC plant, and when do they retire?
1 operable generator totals 200 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 200 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| HS2L | Operating | Solar Photovoltaic | 200 | 2025 | n/a |
| HS2ES | Postponed indefinitely | Batteries | 50 | n/a | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Hornshadow Solar II, LLC plant?
EIA lists no joint owners for Hornshadow Solar II, LLC. Hornshadow Solar II, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Hornshadow Solar II, LLC plant?
Hornshadow Solar II, LLC is in Castle Dale, Emery County, Utah, at 39.1824° N, 110.9772° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Utah are similar in size?
Utah has 55 operable solar plants with 3,037 MW of capacity, and Hornshadow Solar II, LLC's 200 MW is 7% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Appaloosa Solar I | Iron | 200 | 539,459 |
| Hornshadow Solar II, LLC | Emery | 200 | 227,612 |
| Cove Mountain Solar 2 | Iron | 122 | 321,393 |
| Hunter Solar LLC (UT) | Emery | 100 | 259,575 |
| Hornshadow Solar, LLC | Emery | 100 | 149,128 |
Source: EIA Forms EIA-860 and EIA-923, 2025.