Skip to main content
RateWatt

Solar power plant, Utah

Hunter Solar LLC power plant, Utah

Hunter Solar LLC (UT) is a 100 MW solar power plant in Emery County, Utah, operated by Hunter Solar LLC, and it generated 259,575 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in Utah, and its capacity factor sits at the 89th percentile of U.S. solar plants. By 2025 generation it ranks 2,164th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

100 MWNameplate capacity
30%Capacity factor, 2025, 89th percentile, on 100 MW net summer
0.7%Of UT generation, 2025
4 yearsAverage generator age, by MW

How hard does the Hunter Solar LLC (UT) plant run compared with other solar plants?

The Hunter Solar LLC (UT) plant had a capacity factor of 30% in 2025 on 100 MW of net summer capacity, the 89th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 108 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hunter Solar LLC (UT)30%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hunter Solar LLC (UT) plant generating more or less than last year?

Generation at Hunter Solar LLC (UT) fell 2.8% from 2024 to 2025, from 267,133 MWh to 259,575 MWh. Through August 2026 it is running 8.3% behind the same months of 2025.

Net generation by period
PeriodMWh
2024267,133
2025259,575
2026 through August178,885
2025, same months194,982
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202623,332
July 202626,777
June 202623,254
May 202627,965
April 202625,084
March 202624,631
February 202615,043
January 202612,799
December 202511,304
November 202513,096
October 202519,373
September 202520,820
August 202524,893
July 202528,272
June 202531,142
May 202529,491
April 202525,349
March 202521,421
February 202518,098
January 202516,316
December 202414,348
November 202415,822
October 202419,484
September 202425,161
August 202425,080
July 202431,903
June 202428,931
May 202429,145
April 202427,771
March 202420,562
February 202416,312
January 202412,614

Source: EIA Form EIA-923, through August 2026.

How much of Utah's electricity comes from the Hunter Solar LLC (UT) plant?

Hunter Solar LLC (UT) made 0.7% of the 38,124,679 MWh reported by Utah plants in 2025, from 0.9% of the state's 11,140 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 18th largest of 126 plants in Utah, the 2,602nd largest of 14,327 in the U.S. and the 443rd largest of 7,223 solar plants. By 2025 generation it is the 16th largest of 117 generating plants in the state.

Hunter Solar LLC (UT) within Utah, 2025
MeasureThis plantUtahShare
Capacity (MW)10011,1400.9%
Generation (MWh)259,57538,124,6790.7%
Solar capacity (MW)1003,0373.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hunter Solar LLC (UT) plant, and when do they retire?

1 operable generator totals 100 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1100100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
HUSOLOperatingSolar Photovoltaic1002021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hunter Solar LLC (UT) plant?

EIA lists no joint owners for Hunter Solar LLC (UT). Hunter Solar LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Hunter Solar LLC (UT) plant?

Hunter Solar LLC (UT) is in Clawson, Emery County, Utah, at 39.1422° N, 111.0511° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Utah are similar in size?

Utah has 55 operable solar plants with 3,037 MW of capacity, and Hunter Solar LLC (UT)'s 100 MW is 3% of that.

Solar plants in Utah around this size
PlantCountyMW2025 MWh
Appaloosa Solar IIron200539,459
Hornshadow Solar II, LLCEmery200227,612
Cove Mountain Solar 2Iron122321,393
Hunter Solar LLC (UT)Emery100259,575
Hornshadow Solar, LLCEmery100149,128
Milford Solar 1Beaver99260,650
Utah Red Hills Renewable Energy ParkIron80207,926

Source: EIA Forms EIA-860 and EIA-923, 2025.