Skip to main content
RateWatt

Biomass power plant, Washington

Kettle Falls Generating Station, Washington

Kettle Falls Generating Station is a 57.9 MW power plant, 50.7 MW of it biomass, in Stevens County, Washington, operated by Avista Corp, and it generated 287,220 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Washington, and its capacity factor sits at the 75th percentile of U.S. biomass plants. By 2025 generation it ranks 2,032nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

57.9 MWNameplate capacity
65%Capacity factor, 2025, biomass units, 75th percentile, on 50 MW net summer
0.3%Of WA generation, 2025
40 yearsAverage generator age, by MW

How hard does Kettle Falls Generating Station run compared with other biomass plants?

Kettle Falls Generating Station's biomass units had a capacity factor of 65% in 2025 on 50 MW of net summer capacity, the 75th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 239 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Kettle Falls Generating Station65%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its biomass generators only. Values above 105% are left out of the comparison.

Is Kettle Falls Generating Station generating more or less than last year?

Generation at Kettle Falls Generating Station fell 12.9% from 2024 to 2025, from 329,779 MWh to 287,220 MWh.

2 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
2024329,779
2025287,220
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202533,987
November 202528,778
October 202531,621
September 202520,181
August 202533,245
July 202533,433
June 202521,963
May 2025-209
April 2025-296
March 202529,660
February 202526,552
January 202528,304
December 202429,047
November 202431,875
October 202433,652
September 202435,664
August 202434,560
July 202426,403
June 20246,321
May 2024544
April 202422,072
March 202436,663
February 202434,562
January 202438,416

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from Kettle Falls Generating Station?

Kettle Falls Generating Station made 0.3% of the 101,512,862 MWh reported by Washington plants in 2025, from 0.2% of the state's 31,712 MW of capacity. Its share of output is 1.5 times its share of capacity. By capacity it is the 70th largest of 139 plants in Washington, the 3,588th largest of 14,327 in the U.S. and the 85th largest of 585 biomass plants on its biomass units alone. By 2025 generation it is the 54th largest of 129 generating plants in the state.

Kettle Falls Generating Station within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)5831,7120.2%
Generation (MWh)287,220101,512,8620.3%
Biomass capacity (MW)5128417.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Kettle Falls Generating Station, and when do they retire?

2 operable generators total 57.9 MW, with an average age of 40 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s15188%none reported
2000s1712%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingWood/Wood Waste Biomass511983n/a
2OperatingNatural Gas Fired Combustion Turbine72002n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Kettle Falls Generating Station?

EIA lists no joint owners for Kettle Falls Generating Station. Avista Corp operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Avista Corp charge homes?

Avista Corp, the operator of Kettle Falls Generating Station, had an average residential price of 14.16¢ per kWh and an average bill of $130 a month in 2025, 7% above the Washington average of 13.17¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Washington
Avista Corp14.16¢$1307% higher
Washington average13.17¢$124
U.S. average17.23¢$15131% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

What fuels does Kettle Falls Generating Station use?

Kettle Falls Generating Station has capacity on 2 fuels: 88% biomass and 12% natural gas. In 2025, biomass made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Biomass5187.6%286,751
Natural gas712.4%469

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is Kettle Falls Generating Station?

Kettle Falls Generating Station is in Kettle Falls, Stevens County, Washington, at 48.6203° N, 118.1111° W. It sits in the Avista Corporation balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Washington are similar in size?

Washington has 13 operable biomass plants with 284 MW of capacity, and Kettle Falls Generating Station's 50.7 MW is 18% of that.

Biomass plants in Washington around this size
PlantCountyMW2025 MWh
Nippon Dynawave Packaging Longview WACowlitz62203,752
Kettle Falls Generating StationStevens51286,751
Longview FibreCowlitz45198,707
Sierra Pacific Burlington FacilitySkagit28160,243
Spokane Waste to EnergySpokane2660,541

Source: EIA Forms EIA-860 and EIA-923, 2025.