Biomass power plant, Washington

Longview Fibre biomass power plant, Washington

Longview Fibre is a 45 MW biomass power plant in Cowlitz County, Washington, operated by Longview Fibre Co, and it generated 248,463 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Washington, and its capacity factor sits at the 50th percentile of U.S. biomass plants. By 2025 generation it ranks 2,242nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

45 MWNameplate capacity
48%Capacity factor, 2025, 50th percentile, on 47 MW net summer
0.2%Of WA generation, 2025
63 yearsAverage generator age, by MW

How hard does the Longview Fibre plant run compared with other biomass plants?

The Longview Fibre plant had a capacity factor of 48% in 2025 on 47 MW of net summer capacity, the 50th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 176 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Longview Fibre48%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Longview Fibre plant generating more or less than last year?

Generation at Longview Fibre rose 5.5% from 2024 to 2025, from 235,416 MWh to 248,463 MWh.

Net generation by period
PeriodMWh
2024235,416
2025248,463
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202525,360
November 202520,251
October 202522,207
September 202521,918
August 202525,385
July 202515,241
June 20257,242
May 202513,123
April 202524,795
March 202522,891
February 202523,230
January 202526,820
December 202417,648
November 202425,948
October 20244,218
September 202421,937
August 202426,756
July 202420,959
June 202410,309
May 202426,050
April 202426,918
March 20249,706
February 202424,432
January 202420,535

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from the Longview Fibre plant?

Longview Fibre made 0.2% of the 101,512,862 MWh reported by Washington plants in 2025, from 0.1% of the state's 31,712 MW of capacity. Its share of output is 1.7 times its share of capacity. By capacity it is the 75th largest of 139 plants in Washington, the 3,971st largest of 14,327 in the U.S. and the 109th largest of 585 biomass plants. By 2025 generation it is the 60th largest of 129 generating plants in the state.

Longview Fibre within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)4531,7120.1%
Generation (MWh)248,463101,512,8620.2%
Biomass capacity (MW)4528415.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Longview Fibre plant, and when do they retire?

2 operable generators total 45 MW, with an average age of 63 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 5 have already retired, totalling 90 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s12044%none reported
1960s12556%none reported
Every generator, 7 in all
UnitStatusTechnologyMWIn servicePlanned retirement
6OperatingWood/Wood Waste Biomass201958n/a
7OperatingWood/Wood Waste Biomass251966n/a
2RetiredWood/Wood Waste Biomass319362007
3RetiredWood/Wood Waste Biomass419412007
4RetiredWood/Wood Waste Biomass1019492018
5RetiredWood/Wood Waste Biomass619502007
8RetiredNatural Gas Fired Combustion Turbine6819952002

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Longview Fibre plant?

EIA lists no joint owners for Longview Fibre. Longview Fibre Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Longview Fibre plant?

Longview Fibre is in Longview, Cowlitz County, Washington, at 46.1039° N, 122.9184° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Washington are similar in size?

Washington has 13 operable biomass plants with 284 MW of capacity, and Longview Fibre's 45 MW is 16% of that.

Biomass plants in Washington around this size
PlantCountyMW2025 MWh
Nippon Dynawave Packaging Longview WACowlitz62203,752
Kettle Falls Generating StationStevens51286,751
Longview FibreCowlitz45198,707
Sierra Pacific Burlington FacilitySkagit28160,243
Spokane Waste to EnergySpokane2660,541

Source: EIA Forms EIA-860 and EIA-923, 2025.