Biomass power plant, Washington
Spokane Waste to Energy biomass power plant, Washington
Spokane Waste to Energy is a 26 MW biomass power plant in Spokane County, Washington, operated by City of Spokane-(WA), and it generated 134,535 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Washington, and its capacity factor sits at the 20th percentile of U.S. biomass plants. By 2025 generation it ranks 3,066th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Spokane Waste to Energy plant run compared with other biomass plants?
The Spokane Waste to Energy plant had a capacity factor of 30% in 2025 on 22.7 MW of net summer capacity, the 20th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 111 days at full output out of 365.
0%Shaded: the middle half of biomass plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Spokane Waste to Energy | 30% |
| Biomass plants, 75th percentile | 65% |
| Biomass plants, median | 48% |
| Biomass plants, 25th percentile | 35% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Spokane Waste to Energy plant generating more or less than last year?
Generation at Spokane Waste to Energy rose 1.6% from 2024 to 2025, from 132,379 MWh to 134,535 MWh. Through August 2026 it is running 5.4% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 132,379 |
| 2025 | 134,535 |
| 2026 through August | 86,956 |
| 2025, same months | 91,958 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 9,474 |
| July 2026 | 11,062 |
| June 2026 | 11,813 |
| May 2026 | 8,649 |
| April 2026 | 10,792 |
| March 2026 | 12,521 |
| February 2026 | 9,730 |
| January 2026 | 12,915 |
| December 2025 | 12,481 |
| November 2025 | 8,245 |
| October 2025 | 10,887 |
| September 2025 | 10,964 |
| August 2025 | 11,208 |
| July 2025 | 11,888 |
| June 2025 | 12,112 |
| May 2025 | 8,122 |
| April 2025 | 11,554 |
| March 2025 | 12,544 |
| February 2025 | 11,655 |
| January 2025 | 12,875 |
| December 2024 | 11,956 |
| November 2024 | 8,605 |
| October 2024 | 10,943 |
| September 2024 | 10,421 |
| August 2024 | 11,844 |
| July 2024 | 11,974 |
| June 2024 | 12,482 |
| May 2024 | 9,985 |
| April 2024 | 9,000 |
| March 2024 | 12,704 |
| February 2024 | 10,692 |
| January 2024 | 11,773 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Spokane Waste to Energy plant, and when do they retire?
1 operable generator totals 26 MW, with an average age of 34 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1990s | 1 | 26 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Municipal Solid Waste | 26 | 1991 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Spokane Waste to Energy plant?
EIA lists no joint owners for Spokane Waste to Energy. City of Spokane-(WA) operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Spokane Waste to Energy plant?
Spokane Waste to Energy is in Spokane, Spokane County, Washington, at 47.6263° N, 117.5042° W. It sits in the Avista Corporation balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which biomass plants in Washington are similar in size?
Washington has 13 operable biomass plants with 284 MW of capacity, and Spokane Waste to Energy's 26 MW is 9% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Kettle Falls Generating Station | Stevens | 51 | 286,751 |
| Longview Fibre | Cowlitz | 45 | 198,707 |
| Sierra Pacific Burlington Facility | Skagit | 28 | 160,243 |
| Spokane Waste to Energy | Spokane | 26 | 60,541 |
| Sierra Pacific Aberdeen | Grays Harbor | 18 | 91,420 |
| Cosmo Specialty Fibers Plant | Grays Harbor | 15 | n/a |
Source: EIA Forms EIA-860 and EIA-923, 2025.