Skip to main content
RateWatt

Biomass power plant, Washington

Sierra Pacific Burlington Facility, Washington

Sierra Pacific Burlington Facility is a 28 MW biomass power plant in Skagit County, Washington, operated by Sierra Pacific Industries, and it generated 160,243 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Washington, and its capacity factor sits at the 89th percentile of U.S. biomass plants. By 2025 generation it ranks 2,806th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

28 MWNameplate capacity
74%Capacity factor, 2025, 89th percentile, on 24.6 MW net summer
0.2%Of WA generation, 2025
18 yearsAverage generator age, by MW

How hard does the Sierra Pacific Burlington Facility plant run compared with other biomass plants?

The Sierra Pacific Burlington Facility plant had a capacity factor of 74% in 2025 on 24.6 MW of net summer capacity, the 89th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 271 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Sierra Pacific Burlington Facility74%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Sierra Pacific Burlington Facility plant generating more or less than last year?

Generation at Sierra Pacific Burlington Facility rose 5.8% from 2024 to 2025, from 151,423 MWh to 160,243 MWh.

Net generation by period
PeriodMWh
2024151,423
2025160,243
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202514,484
November 202514,241
October 202515,031
September 20258,726
August 202514,775
July 202515,136
June 202512,148
May 202511,484
April 202513,547
March 202512,820
February 202513,704
January 202514,147
December 202414,839
November 202414,298
October 202412,297
September 202413,100
August 202414,662
July 202415,040
June 202412,604
May 20248,172
April 202414,422
March 202415,031
February 20243,879
January 202413,079

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from the Sierra Pacific Burlington Facility plant?

Sierra Pacific Burlington Facility made 0.2% of the 101,512,862 MWh reported by Washington plants in 2025, from 0.1% of the state's 31,712 MW of capacity. Its share of output is 1.8 times its share of capacity. By capacity it is the 80th largest of 139 plants in Washington, the 4,456th largest of 14,327 in the U.S. and the 151st largest of 585 biomass plants. By 2025 generation it is the 68th largest of 129 generating plants in the state.

Sierra Pacific Burlington Facility within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)2831,7120.1%
Generation (MWh)160,243101,512,8620.2%
Biomass capacity (MW)282849.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Sierra Pacific Burlington Facility plant, and when do they retire?

1 operable generator totals 28 MW, with an average age of 18 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s128100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingWood/Wood Waste Biomass282007n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Sierra Pacific Burlington Facility plant?

EIA lists no joint owners for Sierra Pacific Burlington Facility. Sierra Pacific Industries operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Sierra Pacific Burlington Facility plant?

Sierra Pacific Burlington Facility is in Mt Vernon, Skagit County, Washington, at 48.4481° N, 122.4331° W. It sits in the Puget Sound Energy balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Washington are similar in size?

Washington has 13 operable biomass plants with 284 MW of capacity, and Sierra Pacific Burlington Facility's 28 MW is 10% of that.

Biomass plants in Washington around this size
PlantCountyMW2025 MWh
Kettle Falls Generating StationStevens51286,751
Longview FibreCowlitz45198,707
Sierra Pacific Burlington FacilitySkagit28160,243
Spokane Waste to EnergySpokane2660,541
Sierra Pacific AberdeenGrays Harbor1891,420
Cosmo Specialty Fibers PlantGrays Harbor15n/a

Source: EIA Forms EIA-860 and EIA-923, 2025.