Wind power plant, Oregon

Leaning Juniper wind power plant, Oregon

Leaning Juniper is a 110 MW wind power plant in Gilliam County, Oregon, operated by PacifiCorp, and it generated 269,522 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Oregon, and its capacity factor sits at the 42nd percentile of U.S. wind plants. By 2025 generation it ranks 2,116th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

110 MWNameplate capacity
31%Capacity factor, 2025, 42nd percentile, on 101 MW net summer
0.4%Of OR generation, 2025
19 yearsAverage generator age, by MW

How hard does the Leaning Juniper plant run compared with other wind plants?

The Leaning Juniper plant had a capacity factor of 31% in 2025 on 101 MW of net summer capacity, the 42nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 112 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Leaning Juniper31%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Leaning Juniper plant generating more or less than last year?

Generation at Leaning Juniper fell 2.1% from 2024 to 2025, from 275,219 MWh to 269,522 MWh.

Net generation by period
PeriodMWh
2024275,219
2025269,522
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202518,991
November 202511,564
October 202518,907
September 202520,907
August 202527,616
July 202533,383
June 202535,516
May 202533,249
April 202526,445
March 202523,131
February 202512,166
January 20257,647
December 202412,202
November 202415,546
October 202417,987
September 202426,583
August 202427,567
July 202429,828
June 202431,428
May 202438,275
April 202427,353
March 202418,248
February 202417,225
January 202412,977

Source: EIA Form EIA-923, through August 2026.

How much of Oregon's electricity comes from the Leaning Juniper plant?

Leaning Juniper made 0.4% of the 64,124,656 MWh reported by Oregon plants in 2025, from 0.6% of the state's 19,040 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 35th largest of 302 plants in Oregon, the 2,428th largest of 14,327 in the U.S. and the 590th largest of 1,358 wind plants. By 2025 generation it is the 32nd largest of 278 generating plants in the state.

Leaning Juniper within Oregon, 2025
MeasureThis plantOregonShare
Capacity (MW)11019,0400.6%
Generation (MWh)269,52264,124,6560.4%
Wind capacity (MW)1104,1812.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Leaning Juniper plant, and when do they retire?

1 operable generator totals 110 MW, with an average age of 19 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s1110100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine1102006n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Leaning Juniper plant?

EIA lists no joint owners for Leaning Juniper. PacifiCorp operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does PacifiCorp charge homes?

PacifiCorp, the operator of Leaning Juniper, had an average residential price of 15.18¢ per kWh and an average bill of $133 a month in 2025, 2% below the Oregon average of 15.46¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Oregon
PacifiCorp15.18¢$1332% lower
Oregon average15.46¢$134
U.S. average17.23¢$15111% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Leaning Juniper plant?

Leaning Juniper is in Arlington, Gilliam County, Oregon, at 45.6525° N, 120.2098° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Oregon are similar in size?

Oregon has 50 operable wind plants with 4,181 MW of capacity, and Leaning Juniper's 110 MW is 3% of that.

Wind plants in Oregon around this size
PlantCountyMW2025 MWh
Wheatridge East WindMorrow200270,057
Leaning Juniper Wind Power IIGilliam199296,487
FPL Energy Vansycle LLC (OR)Umatilla123225,086
Leaning JuniperGilliam110269,522
Wheat Field Wind Power ProjectGilliam103197,535
Arlington Wind Power ProjectGilliam103199,386
Vansycle II Wind Energy CenterUmatilla102320,128