Wind power plant, Oregon
Wheatridge East Wind power plant, Oregon
Wheatridge East Wind is a 200 MW wind power plant in Morrow County, Oregon, operated by Wheatridge East Wind LLC, and it generated 270,057 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Oregon, and its capacity factor sits at the 5th percentile of U.S. wind plants. By 2025 generation it ranks 2,113th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Wheatridge East Wind plant run compared with other wind plants?
The Wheatridge East Wind plant had a capacity factor of 15% in 2025 on 200 MW of net summer capacity, the 5th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 56 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Wheatridge East Wind | 15% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Wheatridge East Wind plant generating more or less than last year?
Wheatridge East Wind generated 270,057 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 318.9% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 270,057 |
| 2026 through August | 388,670 |
| 2025, same months | 92,784 |
Monthly generation, Jun 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 43,167 |
| July 2026 | 40,744 |
| June 2026 | 63,747 |
| May 2026 | 53,184 |
| April 2026 | 54,871 |
| March 2026 | 67,698 |
| February 2026 | 31,718 |
| January 2026 | 33,541 |
| December 2025 | 70,115 |
| November 2025 | 33,906 |
| October 2025 | 44,897 |
| September 2025 | 28,355 |
| August 2025 | 37,716 |
| July 2025 | 50,074 |
| June 2025 | 4,994 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Wheatridge East Wind plant, and when do they retire?
1 operable generator totals 200 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 200 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| WREW | Operating | Onshore Wind Turbine | 200 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Wheatridge East Wind plant?
EIA lists no joint owners for Wheatridge East Wind. Wheatridge East Wind LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Wheatridge East Wind plant?
Wheatridge East Wind is in Lexington, Morrow County, Oregon, at 45.5426° N, 119.3822° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Oregon are similar in size?
Oregon has 50 operable wind plants with 4,181 MW of capacity, and Wheatridge East Wind's 200 MW is 5% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Golden Hill Wind | Sherman | 201 | 610,921 |
| Montague Wind Power Facility LLC | Gilliam | 200 | 483,209 |
| Wheatridge Hybrid | Morrow | 200 | 544,269 |
| Wheatridge East Wind | Morrow | 200 | 270,057 |
| Leaning Juniper Wind Power II | Gilliam | 199 | 296,487 |
| FPL Energy Vansycle LLC (OR) | Umatilla | 123 | 225,086 |
| Leaning Juniper | Gilliam | 110 | 269,522 |
Source: EIA Forms EIA-860 and EIA-923, 2025.