Wind power plant, Oregon
Leaning Juniper Wind Power II power plant, Oregon
Leaning Juniper Wind Power II is a 199 MW wind power plant in Gilliam County, Oregon, operated by Avangrid Power LLC, and it generated 296,487 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Oregon, and its capacity factor sits at the 6th percentile of U.S. wind plants. By 2025 generation it ranks 1,993rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Leaning Juniper Wind Power II plant run compared with other wind plants?
The Leaning Juniper Wind Power II plant had a capacity factor of 17% in 2025 on 199 MW of net summer capacity, the 6th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 62 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Leaning Juniper Wind Power II | 17% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Leaning Juniper Wind Power II plant generating more or less than last year?
Generation at Leaning Juniper Wind Power II fell 28.8% from 2024 to 2025, from 416,568 MWh to 296,487 MWh.
| Period | MWh |
|---|---|
| 2024 | 416,568 |
| 2025 | 296,487 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 31,471 |
| November 2025 | 19,649 |
| October 2025 | 24,273 |
| September 2025 | 19,714 |
| August 2025 | 23,791 |
| July 2025 | 32,608 |
| June 2025 | 33,965 |
| May 2025 | 31,849 |
| April 2025 | 26,496 |
| March 2025 | 26,684 |
| February 2025 | 15,118 |
| January 2025 | 10,869 |
| December 2024 | 17,468 |
| November 2024 | 26,091 |
| October 2024 | 25,289 |
| September 2024 | 40,739 |
| August 2024 | 43,662 |
| July 2024 | 46,030 |
| June 2024 | 47,158 |
| May 2024 | 56,894 |
| April 2024 | 42,899 |
| March 2024 | 26,286 |
| February 2024 | 23,725 |
| January 2024 | 20,327 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Leaning Juniper Wind Power II plant, and when do they retire?
1 operable generator totals 199 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 199 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 199 | 2011 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Leaning Juniper Wind Power II plant?
EIA lists no joint owners for Leaning Juniper Wind Power II. Avangrid Power LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Leaning Juniper Wind Power II plant?
Leaning Juniper Wind Power II is in Arlington, Gilliam County, Oregon, at 45.6510° N, 120.2598° W. It sits in the Avangrid Renewables LLC balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Oregon are similar in size?
Oregon has 50 operable wind plants with 4,181 MW of capacity, and Leaning Juniper Wind Power II's 199 MW is 5% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Montague Wind Power Facility LLC | Gilliam | 200 | 483,209 |
| Wheatridge Hybrid | Morrow | 200 | 544,269 |
| Wheatridge East Wind | Morrow | 200 | 270,057 |
| Leaning Juniper Wind Power II | Gilliam | 199 | 296,487 |
| FPL Energy Vansycle LLC (OR) | Umatilla | 123 | 225,086 |
| Leaning Juniper | Gilliam | 110 | 269,522 |
| Wheat Field Wind Power Project | Gilliam | 103 | 197,535 |
Source: EIA Forms EIA-860 and EIA-923, 2025.