Wind power plant, Oregon

Wheatridge Hybrid wind power plant, Oregon

Wheatridge Hybrid is a 280 MW power plant, 200 MW of it wind, in Morrow County, Oregon, operated by Wheatridge Wind Holdings, LLC, and it generated 668,296 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.0% of the generation reported in Oregon, and its capacity factor sits at the 44th percentile of U.S. wind plants. By 2025 generation it ranks 1,035th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

280 MWNameplate capacity
31%Capacity factor, 2025, wind units, 44th percentile, on 200 MW net summer
1.0%Of OR generation, 2025
4 yearsAverage generator age, by MW

How hard does the Wheatridge Hybrid plant run compared with other wind plants?

The Wheatridge Hybrid plant's wind units had a capacity factor of 31% in 2025 on 200 MW of net summer capacity, the 44th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 113 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Wheatridge Hybrid31%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its wind generators only. Values above 105% are left out of the comparison.

Is the Wheatridge Hybrid plant generating more or less than last year?

Generation at Wheatridge Hybrid fell 9.5% from 2024 to 2025, from 738,218 MWh to 668,296 MWh. Through August 2026 it is running 1.1% behind the same months of 2025.

Net generation by period
PeriodMWh
2024738,218
2025668,296
2026 through August467,948
2025, same months473,257
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202658,822
July 202663,912
June 202678,313
May 202670,797
April 202667,591
March 202667,559
February 202630,752
January 202630,202
December 202570,004
November 202535,877
October 202549,319
September 202539,839
August 202552,350
July 202568,622
June 202572,757
May 202572,524
April 202564,964
March 202569,929
February 202543,571
January 202528,540
December 202445,222
November 202467,197
October 202448,337
September 202456,994
August 202463,598
July 202466,374
June 202467,954
May 202485,801
April 202468,338
March 202464,614
February 202451,701
January 202452,088

Source: EIA Form EIA-923, through August 2026.

How much of Oregon's electricity comes from the Wheatridge Hybrid plant?

Wheatridge Hybrid made 1.0% of the 64,124,656 MWh reported by Oregon plants in 2025, from 1.5% of the state's 19,040 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 19th largest of 302 plants in Oregon, the 1,144th largest of 14,327 in the U.S. and the 311th largest of 1,358 wind plants on its wind units alone. By 2025 generation it is the 19th largest of 278 generating plants in the state.

Wheatridge Hybrid within Oregon, 2025
MeasureThis plantOregonShare
Capacity (MW)28019,0401.5%
Generation (MWh)668,29664,124,6561.0%
Wind capacity (MW)2004,1814.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Wheatridge Hybrid plant, and when do they retire?

3 operable generators total 280 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s3280100%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
WINDOperatingOnshore Wind Turbine2002020n/a
BTRYOperatingBatteries302022n/a
SOLAROperatingSolar Photovoltaic502022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Wheatridge Hybrid plant?

EIA lists no joint owners for Wheatridge Hybrid. Wheatridge Wind Holdings, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Wheatridge Hybrid plant use?

Wheatridge Hybrid has capacity on 3 fuels: 71% wind, 18% solar and 11% battery and pumped storage. In 2025, wind made 81% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Wind20071.4%544,269
Solar5017.9%137,875
Battery and pumped storage3010.7%-13,848

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Wheatridge Hybrid plant?

Wheatridge Hybrid is in Morrow, Morrow County, Oregon, at 45.5598° N, 119.6338° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Oregon are similar in size?

Oregon has 50 operable wind plants with 4,181 MW of capacity, and Wheatridge Hybrid's 200 MW is 5% of that.

Wind plants in Oregon around this size
PlantCountyMW2025 MWh
North Hurlburt Wind LLCGilliam265516,983
Golden Hill WindSherman201610,921
Montague Wind Power Facility LLCGilliam200483,209
Wheatridge HybridMorrow200544,269
Wheatridge East WindMorrow200270,057
Leaning Juniper Wind Power IIGilliam199296,487
FPL Energy Vansycle LLC (OR)Umatilla123225,086

Source: EIA Forms EIA-860 and EIA-923, 2025.