Wind power plant, Oregon
Wheatridge Hybrid wind power plant, Oregon
Wheatridge Hybrid is a 280 MW power plant, 200 MW of it wind, in Morrow County, Oregon, operated by Wheatridge Wind Holdings, LLC, and it generated 668,296 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.0% of the generation reported in Oregon, and its capacity factor sits at the 44th percentile of U.S. wind plants. By 2025 generation it ranks 1,035th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Wheatridge Hybrid plant run compared with other wind plants?
The Wheatridge Hybrid plant's wind units had a capacity factor of 31% in 2025 on 200 MW of net summer capacity, the 44th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 113 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Wheatridge Hybrid | 31% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its wind generators only. Values above 105% are left out of the comparison.
Is the Wheatridge Hybrid plant generating more or less than last year?
Generation at Wheatridge Hybrid fell 9.5% from 2024 to 2025, from 738,218 MWh to 668,296 MWh. Through August 2026 it is running 1.1% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 738,218 |
| 2025 | 668,296 |
| 2026 through August | 467,948 |
| 2025, same months | 473,257 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 58,822 |
| July 2026 | 63,912 |
| June 2026 | 78,313 |
| May 2026 | 70,797 |
| April 2026 | 67,591 |
| March 2026 | 67,559 |
| February 2026 | 30,752 |
| January 2026 | 30,202 |
| December 2025 | 70,004 |
| November 2025 | 35,877 |
| October 2025 | 49,319 |
| September 2025 | 39,839 |
| August 2025 | 52,350 |
| July 2025 | 68,622 |
| June 2025 | 72,757 |
| May 2025 | 72,524 |
| April 2025 | 64,964 |
| March 2025 | 69,929 |
| February 2025 | 43,571 |
| January 2025 | 28,540 |
| December 2024 | 45,222 |
| November 2024 | 67,197 |
| October 2024 | 48,337 |
| September 2024 | 56,994 |
| August 2024 | 63,598 |
| July 2024 | 66,374 |
| June 2024 | 67,954 |
| May 2024 | 85,801 |
| April 2024 | 68,338 |
| March 2024 | 64,614 |
| February 2024 | 51,701 |
| January 2024 | 52,088 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Wheatridge Hybrid plant, and when do they retire?
3 operable generators total 280 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 3 | 280 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| WIND | Operating | Onshore Wind Turbine | 200 | 2020 | n/a |
| BTRY | Operating | Batteries | 30 | 2022 | n/a |
| SOLAR | Operating | Solar Photovoltaic | 50 | 2022 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Wheatridge Hybrid plant?
EIA lists no joint owners for Wheatridge Hybrid. Wheatridge Wind Holdings, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Wheatridge Hybrid plant use?
Wheatridge Hybrid has capacity on 3 fuels: 71% wind, 18% solar and 11% battery and pumped storage. In 2025, wind made 81% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Wind | 200 | 71.4% | 544,269 |
| Solar | 50 | 17.9% | 137,875 |
| Battery and pumped storage | 30 | 10.7% | -13,848 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Wheatridge Hybrid plant?
Wheatridge Hybrid is in Morrow, Morrow County, Oregon, at 45.5598° N, 119.6338° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Oregon are similar in size?
Oregon has 50 operable wind plants with 4,181 MW of capacity, and Wheatridge Hybrid's 200 MW is 5% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| North Hurlburt Wind LLC | Gilliam | 265 | 516,983 |
| Golden Hill Wind | Sherman | 201 | 610,921 |
| Montague Wind Power Facility LLC | Gilliam | 200 | 483,209 |
| Wheatridge Hybrid | Morrow | 200 | 544,269 |
| Wheatridge East Wind | Morrow | 200 | 270,057 |
| Leaning Juniper Wind Power II | Gilliam | 199 | 296,487 |
| FPL Energy Vansycle LLC (OR) | Umatilla | 123 | 225,086 |
Source: EIA Forms EIA-860 and EIA-923, 2025.