Wind power plant, Texas
Longhorn Wind power plant, Texas
Longhorn Wind is a 200 MW wind power plant in Briscoe County, Texas, operated by Boralex US Operations LLC, and it generated 696,969 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 72nd percentile of U.S. wind plants. By 2025 generation it ranks 996th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Longhorn Wind plant run compared with other wind plants?
The Longhorn Wind plant had a capacity factor of 40% in 2025 on 200 MW of net summer capacity, the 72nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 145 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Longhorn Wind | 40% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Longhorn Wind plant generating more or less than last year?
Generation at Longhorn Wind fell 9.9% from 2024 to 2025, from 773,325 MWh to 696,969 MWh. Through August 2026 it is running 0.6% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 773,325 |
| 2025 | 696,969 |
| 2026 through August | 483,843 |
| 2025, same months | 481,025 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 60,670 |
| July 2026 | 51,472 |
| June 2026 | 58,889 |
| May 2026 | 55,083 |
| April 2026 | 61,375 |
| March 2026 | 71,269 |
| February 2026 | 62,745 |
| January 2026 | 62,340 |
| December 2025 | 67,560 |
| November 2025 | 55,277 |
| October 2025 | 51,526 |
| September 2025 | 41,581 |
| August 2025 | 49,357 |
| July 2025 | 46,750 |
| June 2025 | 58,927 |
| May 2025 | 56,454 |
| April 2025 | 73,193 |
| March 2025 | 81,990 |
| February 2025 | 51,491 |
| January 2025 | 62,863 |
| December 2024 | 62,110 |
| November 2024 | 73,058 |
| October 2024 | 67,491 |
| September 2024 | 38,183 |
| August 2024 | 51,268 |
| July 2024 | 53,910 |
| June 2024 | 59,850 |
| May 2024 | 65,993 |
| April 2024 | 84,988 |
| March 2024 | 78,602 |
| February 2024 | 81,096 |
| January 2024 | 56,776 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Longhorn Wind plant, and when do they retire?
1 operable generator totals 200 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 200 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Onshore Wind Turbine | 200 | 2015 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Longhorn Wind plant?
2 owners report shares in Longhorn Wind; Boralex US Wind TNM LLC holds the largest named share, 50.0% or about 100 MW. Boralex US Operations LLC operates the plant.
| Owner | Share | MW | 2025 MWh, by share |
|---|---|---|---|
| Boralex US Wind TNM LLC | 50.0% | 100 | 348,485 |
| Axium Great Plains Wind, LLC | 50.0% | 100 | 348,485 |
Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.
Where is the Longhorn Wind plant?
Longhorn Wind is in Silverton, Briscoe County, Texas, at 34.3111° N, 101.2511° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Longhorn Wind's 200 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Mesquite Wind Power LLC | Shackelford | 200 | 346,274 |
| Post Oak Wind LLC | Shackelford | 200 | 413,996 |
| Los Vientos Wind 1A | Cameron | 200 | 408,298 |
| Longhorn Wind | Briscoe | 200 | 696,969 |
| TX Hereford Wind | Deaf Smith | 200 | 526,300 |
| Colbeck's Corner, LLC | Carson | 200 | 788,428 |
| Los Vientos Windpower III | Starr | 200 | 447,710 |
Source: EIA Forms EIA-860 and EIA-923, 2025.