Skip to main content
RateWatt

Wind power plant, Texas

Colbeck's Corner, LLC wind power plant, Texas

Colbeck's Corner, LLC is a 200 MW wind power plant in Carson County, Texas, operated by RWE Clean Energy, and it generated 788,428 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 91st percentile of U.S. wind plants. By 2025 generation it ranks 894th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
45%Capacity factor, 2025, 91st percentile, on 200 MW net summer
0.1%Of TX generation, 2025
9 yearsAverage generator age, by MW

How hard does the Colbeck's Corner, LLC plant run compared with other wind plants?

The Colbeck's Corner, LLC plant had a capacity factor of 45% in 2025 on 200 MW of net summer capacity, the 91st percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 164 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Colbeck's Corner, LLC45%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Colbeck's Corner, LLC plant generating more or less than last year?

Generation at Colbeck's Corner, LLC fell 7.2% from 2024 to 2025, from 849,934 MWh to 788,428 MWh. Through August 2026 it is running 11.7% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024849,934
2025788,428
2026 through August572,063
2025, same months512,005
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202665,603
July 202664,658
June 202657,722
May 202665,450
April 202687,317
March 202685,261
February 202670,590
January 202675,462
December 202575,420
November 202572,407
October 202569,660
September 202558,936
August 202556,321
July 202557,346
June 202566,197
May 202554,547
April 202569,618
March 202567,056
February 202568,030
January 202572,890
December 202473,024
November 202475,418
October 202480,122
September 202454,532
August 202454,715
July 202457,577
June 202475,126
May 202470,232
April 202483,291
March 202480,737
February 202479,979
January 202465,181

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Colbeck's Corner, LLC plant?

Colbeck's Corner, LLC made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 302nd largest of 1,023 plants in Texas, the 1,524th largest of 14,327 in the U.S. and the 295th largest of 1,358 wind plants. By 2025 generation it is the 160th largest of 816 generating plants in the state.

Colbeck's Corner, LLC within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)200195,9660.1%
Generation (MWh)788,428592,896,1760.1%
Wind capacity (MW)20043,9420.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Colbeck's Corner, LLC plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GVIIOperatingOnshore Wind Turbine2002016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Colbeck's Corner, LLC plant?

EIA lists no joint owners for Colbeck's Corner, LLC. RWE Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Colbeck's Corner, LLC plant?

Colbeck's Corner, LLC is in Groom, Carson County, Texas, at 35.2542° N, 101.1866° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Colbeck's Corner, LLC's 200 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Los Vientos Wind 1ACameron200408,298
Longhorn WindBriscoe200696,969
TX Hereford WindDeaf Smith200526,300
Colbeck's Corner, LLCCarson200788,428
Los Vientos Windpower IIIStarr200447,710
Los Vientos Windpower IVStarr200421,995
South Plains Wind Phase IFloyd200677,007

Source: EIA Forms EIA-860 and EIA-923, 2025.