Wind power plant, Texas

South Plains Wind Phase I power plant, Texas

South Plains Wind Phase I is a 200 MW wind power plant in Floyd County, Texas, operated by Evergreen Wind, LLC, and it generated 677,007 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 69th percentile of U.S. wind plants. By 2025 generation it ranks 1,019th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
39%Capacity factor, 2025, 69th percentile, on 200 MW net summer
0.1%Of TX generation, 2025
10 yearsAverage generator age, by MW

How hard does the South Plains Wind Phase I plant run compared with other wind plants?

The South Plains Wind Phase I plant had a capacity factor of 39% in 2025 on 200 MW of net summer capacity, the 69th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 141 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
South Plains Wind Phase I39%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the South Plains Wind Phase I plant generating more or less than last year?

Generation at South Plains Wind Phase I rose 14.3% from 2024 to 2025, from 592,424 MWh to 677,007 MWh. Through August 2026 it is running 13.3% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024592,424
2025677,007
2026 through August515,146
2025, same months454,821
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202659,504
July 202647,978
June 202668,364
May 202662,097
April 202673,798
March 202681,388
February 202662,307
January 202659,710
December 202558,383
November 202560,879
October 202556,331
September 202546,593
August 202550,237
July 202544,587
June 202559,006
May 202555,806
April 202564,654
March 202570,683
February 202551,712
January 202558,136
December 202455,285
November 202448,746
October 202462,774
September 202441,488
August 202449,818
July 202452,746
June 202459,423
May 202445,673
April 202437,736
March 202433,131
February 202454,779
January 202450,825

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the South Plains Wind Phase I plant?

South Plains Wind Phase I made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. By capacity it is the 302nd largest of 1,023 plants in Texas, the 1,524th largest of 14,327 in the U.S. and the 299th largest of 1,358 wind plants. By 2025 generation it is the 191st largest of 816 generating plants in the state.

South Plains Wind Phase I within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)200195,9660.1%
Generation (MWh)677,007592,896,1760.1%
Wind capacity (MW)20043,9420.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the South Plains Wind Phase I plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine2002015n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the South Plains Wind Phase I plant?

EIA lists no joint owners for South Plains Wind Phase I. Evergreen Wind, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the South Plains Wind Phase I plant?

South Plains Wind Phase I is in Floydada, Floyd County, Texas, at 34.0806° N, 101.3236° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and South Plains Wind Phase I's 200 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Colbeck's Corner, LLCCarson200788,428
Los Vientos Windpower IIIStarr200447,710
Los Vientos Windpower IVStarr200421,995
South Plains Wind Phase IFloyd200677,007
Javelina Wind Energy II, LLCWebb200761,596
Flat Top Wind IMills200786,606
Live Oak Wind ProjectSchleicher200791,664

Source: EIA Forms EIA-860 and EIA-923, 2025.