Live Oak Wind Project is a 200 MW wind power plant in Schleicher County, Texas, operated by Engie North America, and it generated 791,664 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 92nd percentile of U.S. wind plants. By 2025 generation it ranks 891st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
45%Capacity factor, 2025, 92nd percentile, on 200 MW net summer
0.1%Of TX generation, 2025
6 yearsAverage generator age, by MW

How hard does the Live Oak Wind Project plant run compared with other wind plants?

The Live Oak Wind Project plant had a capacity factor of 45% in 2025 on 200 MW of net summer capacity, the 92nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 165 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Live Oak Wind Project45%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Live Oak Wind Project plant generating more or less than last year?

Generation at Live Oak Wind Project rose 6.0% from 2024 to 2025, from 746,745 MWh to 791,664 MWh. Through August 2026 it is running 6.7% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024746,745
2025791,664
2026 through August574,947
2025, same months538,892
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202663,743
July 202658,195
June 202682,603
May 202667,550
April 202673,819
March 2026100,156
February 202667,877
January 202661,004
December 202580,109
November 202567,281
October 202558,440
September 202546,942
August 202545,423
July 202558,355
June 202578,919
May 202557,938
April 202586,050
March 202582,093
February 202567,397
January 202562,717
December 202465,533
November 202472,403
October 202471,728
September 202435,195
August 202450,130
July 202453,549
June 202462,089
May 202459,789
April 202482,338
March 202458,285
February 202478,969
January 202456,737

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Live Oak Wind Project plant?

Live Oak Wind Project made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 334th largest of 1,023 plants in Texas, the 1,643rd largest of 14,327 in the U.S. and the 326th largest of 1,358 wind plants. By 2025 generation it is the 159th largest of 816 generating plants in the state.

Live Oak Wind Project within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)200195,9660.1%
Generation (MWh)791,664592,896,1760.1%
Wind capacity (MW)20043,9420.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Live Oak Wind Project plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
WTGSOperatingOnshore Wind Turbine2002019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Live Oak Wind Project plant?

Live Oak Wind Project, LLC is the only joint owner reported for Live Oak Wind Project, with 100.0%. Engie North America operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Live Oak Wind Project plant?

Live Oak Wind Project is in Eldorado, Schleicher County, Texas, at 31.0486° N, 100.6231° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Live Oak Wind Project's 200 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
South Plains Wind Phase IFloyd200677,007
Javelina Wind Energy II, LLCWebb200761,596
Flat Top Wind IMills200786,606
Live Oak Wind ProjectSchleicher200791,664
La Chalupa, LLCCameron199443,574
Trinity HillsYoung198767,441
Inadale Wind Farm LLC HybridNolan197322,030

Source: EIA Forms EIA-860 and EIA-923, 2025.