Wind power plant, Texas

Javelina Wind Energy II, LLC power plant, Texas

Javelina Wind Energy II, LLC is a 200 MW wind power plant in Webb County, Texas, operated by Javelina Wind Energy II, LLC, and it generated 761,596 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 87th percentile of U.S. wind plants. By 2025 generation it ranks 923rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
43%Capacity factor, 2025, 87th percentile, on 200 MW net summer
0.1%Of TX generation, 2025
9 yearsAverage generator age, by MW

How hard does the Javelina Wind Energy II, LLC plant run compared with other wind plants?

The Javelina Wind Energy II, LLC plant had a capacity factor of 43% in 2025 on 200 MW of net summer capacity, the 87th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 159 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Javelina Wind Energy II, LLC43%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Javelina Wind Energy II, LLC plant generating more or less than last year?

Generation at Javelina Wind Energy II, LLC rose 10.6% from 2024 to 2025, from 688,666 MWh to 761,596 MWh.

Net generation by period
PeriodMWh
2024688,666
2025761,596
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202543,294
November 202564,090
October 202552,787
September 202540,838
August 202555,807
July 202586,984
June 202584,671
May 202569,199
April 202589,274
March 202575,447
February 202550,721
January 202548,484
December 202454,229
November 202464,471
October 202453,820
September 202438,338
August 202451,709
July 202453,228
June 202469,327
May 202463,250
April 202470,324
March 202461,894
February 202458,321
January 202449,755

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Javelina Wind Energy II, LLC plant?

Javelina Wind Energy II, LLC made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 302nd largest of 1,023 plants in Texas, the 1,524th largest of 14,327 in the U.S. and the 303rd largest of 1,358 wind plants. By 2025 generation it is the 167th largest of 816 generating plants in the state.

Javelina Wind Energy II, LLC within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)200195,9660.1%
Generation (MWh)761,596592,896,1760.1%
Wind capacity (MW)20043,9420.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Javelina Wind Energy II, LLC plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
WJ21OperatingOnshore Wind Turbine2002016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Javelina Wind Energy II, LLC plant?

EIA lists no joint owners for Javelina Wind Energy II, LLC. Javelina Wind Energy II, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Javelina Wind Energy II, LLC plant?

Javelina Wind Energy II, LLC is in MIRANDO, Webb County, Texas, at 27.4400° N, 98.9100° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Javelina Wind Energy II, LLC's 200 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Los Vientos Windpower IIIStarr200447,710
Los Vientos Windpower IVStarr200421,995
South Plains Wind Phase IFloyd200677,007
Javelina Wind Energy II, LLCWebb200761,596
Flat Top Wind IMills200786,606
Live Oak Wind ProjectSchleicher200791,664
La Chalupa, LLCCameron199443,574

Source: EIA Forms EIA-860 and EIA-923, 2025.