Wind power plant, Texas

Los Vientos Windpower IV wind power plant, Texas

Los Vientos Windpower IV is a 200 MW wind power plant in Starr County, Texas, operated by Deriva Energy, and it generated 421,995 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 19th percentile of U.S. wind plants. By 2025 generation it ranks 1,529th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
24%Capacity factor, 2025, 19th percentile, on 200 MW net summer
0.1%Of TX generation, 2025
9 yearsAverage generator age, by MW

How hard does the Los Vientos Windpower IV plant run compared with other wind plants?

The Los Vientos Windpower IV plant had a capacity factor of 24% in 2025 on 200 MW of net summer capacity, the 19th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 88 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Los Vientos Windpower IV24%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Los Vientos Windpower IV plant generating more or less than last year?

Generation at Los Vientos Windpower IV fell 9.6% from 2024 to 2025, from 466,943 MWh to 421,995 MWh. Through August 2026 it is running 3.8% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024466,943
2025421,995
2026 through August338,759
2025, same months326,271
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202633,920
July 202643,697
June 202639,996
May 202641,965
April 202646,401
March 202658,295
February 202632,931
January 202641,554
December 202524,653
November 202545,260
October 202513,296
September 202512,515
August 202534,078
July 202554,444
June 202523,861
May 202543,364
April 202557,562
March 202548,378
February 202532,931
January 202531,653
December 202426,080
November 202428,238
October 202425,181
September 202419,197
August 202426,232
July 202446,031
June 202450,822
May 202452,120
April 202452,658
March 202445,878
February 202449,852
January 202444,654

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Los Vientos Windpower IV plant?

Los Vientos Windpower IV made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 302nd largest of 1,023 plants in Texas, the 1,524th largest of 14,327 in the U.S. and the 298th largest of 1,358 wind plants. By 2025 generation it is the 317th largest of 816 generating plants in the state.

Los Vientos Windpower IV within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)200195,9660.1%
Generation (MWh)421,995592,896,1760.1%
Wind capacity (MW)20043,9420.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Los Vientos Windpower IV plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingOnshore Wind Turbine2002016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Los Vientos Windpower IV plant?

Los Vientos Windpower IV, LLC is the only joint owner reported for Los Vientos Windpower IV, with 100.0%. Deriva Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Los Vientos Windpower IV plant?

Los Vientos Windpower IV is in Rio Grande City, Starr County, Texas, at 26.3806° N, 98.8183° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Los Vientos Windpower IV's 200 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
TX Hereford WindDeaf Smith200526,300
Colbeck's Corner, LLCCarson200788,428
Los Vientos Windpower IIIStarr200447,710
Los Vientos Windpower IVStarr200421,995
South Plains Wind Phase IFloyd200677,007
Javelina Wind Energy II, LLCWebb200761,596
Flat Top Wind IMills200786,606

Source: EIA Forms EIA-860 and EIA-923, 2025.