Skip to main content
RateWatt

Wind power plant, Texas

TX Hereford Wind power plant, Texas

TX Hereford Wind is a 200 MW wind power plant in Deaf Smith County, Texas, operated by Boralex US Operations LLC, and it generated 526,300 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 39th percentile of U.S. wind plants. By 2025 generation it ranks 1,290th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
30%Capacity factor, 2025, 39th percentile, on 200 MW net summer
0.1%Of TX generation, 2025
11 yearsAverage generator age, by MW

How hard does the TX Hereford Wind plant run compared with other wind plants?

The TX Hereford Wind plant had a capacity factor of 30% in 2025 on 200 MW of net summer capacity, the 39th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 110 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
TX Hereford Wind30%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the TX Hereford Wind plant generating more or less than last year?

Generation at TX Hereford Wind fell 29.7% from 2024 to 2025, from 748,905 MWh to 526,300 MWh. Through August 2026 it is running 26.7% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024748,905
2025526,300
2026 through August430,586
2025, same months339,853
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202657,847
July 202652,710
June 202656,457
May 202653,225
April 202656,090
March 202659,293
February 202650,802
January 202644,162
December 202542,307
November 202547,694
October 202550,738
September 202545,708
August 202548,109
July 202543,977
June 202545,085
May 202534,386
April 202531,868
March 202541,598
February 202546,450
January 202548,380
December 202458,463
November 202468,229
October 202465,811
September 202446,808
August 202449,582
July 202455,004
June 202467,531
May 202468,420
April 202475,128
March 202470,591
February 202474,888
January 202448,450

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the TX Hereford Wind plant?

TX Hereford Wind made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. By capacity it is the 302nd largest of 1,023 plants in Texas, the 1,524th largest of 14,327 in the U.S. and the 293rd largest of 1,358 wind plants. By 2025 generation it is the 270th largest of 816 generating plants in the state.

TX Hereford Wind within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)200195,9660.1%
Generation (MWh)526,300592,896,1760.1%
Wind capacity (MW)20043,9420.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the TX Hereford Wind plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingOnshore Wind Turbine2002014n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the TX Hereford Wind plant?

2 owners report shares in TX Hereford Wind; Boralex US Wind TNM LLC holds the largest named share, 50.0% or about 100 MW. Boralex US Operations LLC operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Boralex US Wind TNM LLC50.0%100263,150
Axium Great Plains Wind, LLC50.0%100263,150

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the TX Hereford Wind plant?

TX Hereford Wind is in Hereford, Deaf Smith County, Texas, at 34.7481° N, 102.1744° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and TX Hereford Wind's 200 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Post Oak Wind LLCShackelford200413,996
Los Vientos Wind 1ACameron200408,298
Longhorn WindBriscoe200696,969
TX Hereford WindDeaf Smith200526,300
Colbeck's Corner, LLCCarson200788,428
Los Vientos Windpower IIIStarr200447,710
Los Vientos Windpower IVStarr200421,995

Source: EIA Forms EIA-860 and EIA-923, 2025.