Wind power plant, Texas
Flat Top Wind I power plant, Texas
Flat Top Wind I is a 200 MW wind power plant in Mills County, Texas, operated by BHE Renewables, LLC, and it generated 786,606 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 91st percentile of U.S. wind plants. By 2025 generation it ranks 896th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Flat Top Wind I plant run compared with other wind plants?
The Flat Top Wind I plant had a capacity factor of 45% in 2025 on 200 MW of net summer capacity, the 91st percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 164 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Flat Top Wind I | 45% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Flat Top Wind I plant generating more or less than last year?
Generation at Flat Top Wind I rose 5.9% from 2024 to 2025, from 742,606 MWh to 786,606 MWh. Through August 2026 it is running 4.7% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 742,606 |
| 2025 | 786,606 |
| 2026 through August | 574,492 |
| 2025, same months | 548,827 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 64,333 |
| July 2026 | 59,980 |
| June 2026 | 77,601 |
| May 2026 | 62,100 |
| April 2026 | 82,551 |
| March 2026 | 97,441 |
| February 2026 | 65,772 |
| January 2026 | 64,714 |
| December 2025 | 78,028 |
| November 2025 | 50,687 |
| October 2025 | 67,332 |
| September 2025 | 41,732 |
| August 2025 | 42,642 |
| July 2025 | 61,430 |
| June 2025 | 72,816 |
| May 2025 | 65,609 |
| April 2025 | 88,156 |
| March 2025 | 88,733 |
| February 2025 | 63,592 |
| January 2025 | 65,849 |
| December 2024 | 66,234 |
| November 2024 | 74,255 |
| October 2024 | 21,818 |
| September 2024 | 38,940 |
| August 2024 | 44,565 |
| July 2024 | 55,734 |
| June 2024 | 62,689 |
| May 2024 | 71,501 |
| April 2024 | 89,427 |
| March 2024 | 74,046 |
| February 2024 | 81,263 |
| January 2024 | 62,134 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Flat Top Wind I plant, and when do they retire?
1 operable generator totals 200 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 200 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| FTWI | Operating | Onshore Wind Turbine | 200 | 2018 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Flat Top Wind I plant?
EIA lists no joint owners for Flat Top Wind I. BHE Renewables, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Flat Top Wind I plant?
Flat Top Wind I is in Mullin, Mills County, Texas, at 31.6845° N, 98.6034° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Flat Top Wind I's 200 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Los Vientos Windpower IV | Starr | 200 | 421,995 |
| South Plains Wind Phase I | Floyd | 200 | 677,007 |
| Javelina Wind Energy II, LLC | Webb | 200 | 761,596 |
| Flat Top Wind I | Mills | 200 | 786,606 |
| Live Oak Wind Project | Schleicher | 200 | 791,664 |
| La Chalupa, LLC | Cameron | 199 | 443,574 |
| Trinity Hills | Young | 198 | 767,441 |
Source: EIA Forms EIA-860 and EIA-923, 2025.