Wind power plant, South Dakota

North Bend Wind Project, LLC power plant, South Dakota

North Bend Wind Project, LLC is a 200 MW wind power plant in Hyde County, South Dakota, operated by North Bend Wind Project, LLC, and it generated 883,234 MWh in 2025 (Forms EIA-860 and EIA-923). That is 4.0% of the generation reported in South Dakota, and its capacity factor sits at the 99th percentile of U.S. wind plants. By 2025 generation it ranks 805th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
50%Capacity factor, 2025, 99th percentile, on 200 MW net summer
4.0%Of SD generation, 2025
2 yearsAverage generator age, by MW

How hard does the North Bend Wind Project, LLC plant run compared with other wind plants?

The North Bend Wind Project, LLC plant had a capacity factor of 50% in 2025 on 200 MW of net summer capacity, the 99th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 184 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
North Bend Wind Project, LLC50%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the North Bend Wind Project, LLC plant generating more or less than last year?

Generation at North Bend Wind Project, LLC rose 17.2% from 2024 to 2025, from 753,770 MWh to 883,234 MWh. Through August 2026 it is running 22.5% behind the same months of 2025.

Net generation by period
PeriodMWh
2024753,770
2025883,234
2026 through August456,351
2025, same months589,185
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202622,395
July 20260
June 202666,656
May 202679,823
April 202673,077
March 202681,642
February 202664,571
January 202668,187
December 202575,444
November 202564,824
October 202594,128
September 202559,653
August 202565,899
July 202563,302
June 202563,020
May 202575,160
April 202582,962
March 202584,982
February 202568,262
January 202585,598
December 202475,349
November 202466,637
October 202415,791
September 202434,255
August 202471,115
July 202452,337
June 202471,547
May 202469,085
April 202492,295
March 202486,671
February 202464,543
January 202454,145

Source: EIA Form EIA-923, through August 2026.

How much of South Dakota's electricity comes from the North Bend Wind Project, LLC plant?

North Bend Wind Project, LLC made 4.0% of the 21,865,712 MWh reported by South Dakota plants in 2025, from 2.6% of the state's 7,670 MW of capacity. Its share of output is 1.5 times its share of capacity. By capacity it is the 16th largest of 54 plants in South Dakota, the 1,524th largest of 14,327 in the U.S. and the 320th largest of 1,358 wind plants. By 2025 generation it is the 8th largest of 50 generating plants in the state.

North Bend Wind Project, LLC within South Dakota, 2025
MeasureThis plantSouth DakotaShare
Capacity (MW)2007,6702.6%
Generation (MWh)883,23421,865,7124.0%
Wind capacity (MW)2003,4575.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the North Bend Wind Project, LLC plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
NBENDOperatingOnshore Wind Turbine2002023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the North Bend Wind Project, LLC plant?

EIA lists no joint owners for North Bend Wind Project, LLC. North Bend Wind Project, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the North Bend Wind Project, LLC plant?

North Bend Wind Project, LLC is in Highmore, Hyde County, South Dakota, at 44.3773° N, 99.6601° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in South Dakota are similar in size?

South Dakota has 25 operable wind plants with 3,457 MW of capacity, and North Bend Wind Project, LLC's 200 MW is 6% of that.

Wind plants in South Dakota around this size
PlantCountyMW2025 MWh
Crowned Ridge Wind Energy CenterCodington200811,568
Crocker Wind FarmClark200787,190
Sweetland Wind Farm, LLCHand200765,372
North Bend Wind Project, LLCHyde200883,234
Prairie Winds SD1Jerauld162358,076
Tatanka RidgeDeuel154593,774
Dakota Range III Wind ProjectGrant154618,959

Source: EIA Forms EIA-860 and EIA-923, 2025.