Wind power plant, South Dakota

Crocker Wind Farm, South Dakota

Crocker Wind Farm is a 200 MW wind power plant in Clark County, South Dakota, operated by Geronimo Power, and it generated 787,190 MWh in 2025 (Forms EIA-860 and EIA-923). That is 3.6% of the generation reported in South Dakota, and its capacity factor sits at the 91st percentile of U.S. wind plants. By 2025 generation it ranks 895th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
45%Capacity factor, 2025, 91st percentile, on 200 MW net summer
3.6%Of SD generation, 2025
6 yearsAverage generator age, by MW

How hard does the Crocker Wind Farm plant run compared with other wind plants?

The Crocker Wind Farm plant had a capacity factor of 45% in 2025 on 200 MW of net summer capacity, the 91st percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 164 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Crocker Wind Farm45%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Crocker Wind Farm plant generating more or less than last year?

Generation at Crocker Wind Farm fell 2.2% from 2024 to 2025, from 804,559 MWh to 787,190 MWh. Through August 2026 it is running 0.9% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024804,559
2025787,190
2026 through August502,836
2025, same months498,482
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202647,028
July 202654,359
June 202654,750
May 202671,578
April 202672,025
March 202676,478
February 202659,710
January 202666,908
December 202575,934
November 202560,108
October 202593,420
September 202559,246
August 202553,810
July 202551,332
June 202534,203
May 202547,665
April 202583,178
March 202584,825
February 202563,304
January 202580,165
December 202469,108
November 202460,918
October 202479,404
September 202475,250
August 202461,418
July 202443,338
June 202461,332
May 202466,392
April 202488,172
March 202482,721
February 202465,625
January 202450,881

Source: EIA Form EIA-923, through August 2026.

How much of South Dakota's electricity comes from the Crocker Wind Farm plant?

Crocker Wind Farm made 3.6% of the 21,865,712 MWh reported by South Dakota plants in 2025, from 2.6% of the state's 7,670 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 16th largest of 54 plants in South Dakota, the 1,524th largest of 14,327 in the U.S. and the 302nd largest of 1,358 wind plants. By 2025 generation it is the 12th largest of 50 generating plants in the state.

Crocker Wind Farm within South Dakota, 2025
MeasureThis plantSouth DakotaShare
Capacity (MW)2007,6702.6%
Generation (MWh)787,19021,865,7123.6%
Wind capacity (MW)2003,4575.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Crocker Wind Farm plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CRCKROperatingOnshore Wind Turbine2002019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Crocker Wind Farm plant?

EIA lists no joint owners for Crocker Wind Farm. Geronimo Power operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Crocker Wind Farm plant?

Crocker Wind Farm is in Conde, Clark County, South Dakota, at 45.0515° N, 97.8264° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in South Dakota are similar in size?

South Dakota has 25 operable wind plants with 3,457 MW of capacity, and Crocker Wind Farm's 200 MW is 6% of that.

Wind plants in South Dakota around this size
PlantCountyMW2025 MWh
Buffalo Ridge II LLCBrookings210479,324
Crowned Ridge Wind II Energy CenterCodington201869,983
Crowned Ridge Wind Energy CenterCodington200811,568
Crocker Wind FarmClark200787,190
Sweetland Wind Farm, LLCHand200765,372
North Bend Wind Project, LLCHyde200883,234
Prairie Winds SD1Jerauld162358,076

Source: EIA Forms EIA-860 and EIA-923, 2025.