Skip to main content
RateWatt

Wind power plant, South Dakota

Crowned Ridge Wind Energy Center, South Dakota

Crowned Ridge Wind Energy Center is a 200 MW wind power plant in Codington County, South Dakota, operated by Crowned Ridge Wind, LLC, and it generated 811,568 MWh in 2025 (Forms EIA-860 and EIA-923). That is 3.7% of the generation reported in South Dakota, and its capacity factor sits at the 94th percentile of U.S. wind plants. By 2025 generation it ranks 865th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
46%Capacity factor, 2025, 94th percentile, on 200 MW net summer
3.7%Of SD generation, 2025
6 yearsAverage generator age, by MW

How hard does the Crowned Ridge Wind Energy Center plant run compared with other wind plants?

The Crowned Ridge Wind Energy Center plant had a capacity factor of 46% in 2025 on 200 MW of net summer capacity, the 94th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 169 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Crowned Ridge Wind Energy Center46%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Crowned Ridge Wind Energy Center plant generating more or less than last year?

Generation at Crowned Ridge Wind Energy Center rose 6.5% from 2024 to 2025, from 762,363 MWh to 811,568 MWh. Through August 2026 it is running 0.8% behind the same months of 2025.

Net generation by period
PeriodMWh
2024762,363
2025811,568
2026 through August542,052
2025, same months546,374
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202648,562
July 202654,462
June 202669,119
May 202672,736
April 202665,002
March 202687,589
February 202668,492
January 202676,090
December 202568,680
November 202560,036
October 202581,921
September 202554,557
August 202547,934
July 202552,479
June 202552,022
May 202568,407
April 202573,981
March 202583,554
February 202572,584
January 202595,413
December 202471,019
November 202470,179
October 202478,164
September 202440,638
August 202449,403
July 202444,181
June 202459,077
May 202470,015
April 202467,021
March 202478,071
February 202467,396
January 202467,199

Source: EIA Form EIA-923, through August 2026.

How much of South Dakota's electricity comes from the Crowned Ridge Wind Energy Center plant?

Crowned Ridge Wind Energy Center made 3.7% of the 21,865,712 MWh reported by South Dakota plants in 2025, from 2.6% of the state's 7,670 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 15th largest of 54 plants in South Dakota, the 1,519th largest of 14,327 in the U.S. and the 272nd largest of 1,358 wind plants. By 2025 generation it is the 11th largest of 50 generating plants in the state.

Crowned Ridge Wind Energy Center within South Dakota, 2025
MeasureThis plantSouth DakotaShare
Capacity (MW)2007,6702.6%
Generation (MWh)811,56821,865,7123.7%
Wind capacity (MW)2003,4575.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Crowned Ridge Wind Energy Center plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CTTL1OperatingOnshore Wind Turbine2002019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Crowned Ridge Wind Energy Center plant?

EIA lists no joint owners for Crowned Ridge Wind Energy Center. Crowned Ridge Wind, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Crowned Ridge Wind Energy Center plant?

Crowned Ridge Wind Energy Center is in Watertown, Codington County, South Dakota, at 45.1549° N, 96.8368° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in South Dakota are similar in size?

South Dakota has 25 operable wind plants with 3,457 MW of capacity, and Crowned Ridge Wind Energy Center's 200 MW is 6% of that.

Wind plants in South Dakota around this size
PlantCountyMW2025 MWh
Prevailing Wind ParkYankton220850,790
Buffalo Ridge II LLCBrookings210479,324
Crowned Ridge Wind II Energy CenterCodington201869,983
Crowned Ridge Wind Energy CenterCodington200811,568
Crocker Wind FarmClark200787,190
Sweetland Wind Farm, LLCHand200765,372
North Bend Wind Project, LLCHyde200883,234

Source: EIA Forms EIA-860 and EIA-923, 2025.