Skip to main content
RateWatt

Wind power plant, South Dakota

Prevailing Wind Park power plant, South Dakota

Prevailing Wind Park is a 220 MW wind power plant in Yankton County, South Dakota, operated by AES Distributed Energy, and it generated 850,790 MWh in 2025 (Forms EIA-860 and EIA-923). That is 3.9% of the generation reported in South Dakota, and its capacity factor sits at the 88th percentile of U.S. wind plants. By 2025 generation it ranks 836th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

220 MWNameplate capacity
44%Capacity factor, 2025, 88th percentile, on 220 MW net summer
3.9%Of SD generation, 2025
5 yearsAverage generator age, by MW

How hard does the Prevailing Wind Park plant run compared with other wind plants?

The Prevailing Wind Park plant had a capacity factor of 44% in 2025 on 220 MW of net summer capacity, the 88th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 161 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Prevailing Wind Park44%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Prevailing Wind Park plant generating more or less than last year?

Generation at Prevailing Wind Park fell 2.4% from 2024 to 2025, from 871,801 MWh to 850,790 MWh. Through August 2026 it is running 5.2% behind the same months of 2025.

Net generation by period
PeriodMWh
2024871,801
2025850,790
2026 through August531,338
2025, same months560,603
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202645,048
July 202655,970
June 202652,408
May 202664,275
April 202679,340
March 202685,225
February 202672,104
January 202676,968
December 202573,521
November 202569,540
October 202588,018
September 202559,108
August 202554,452
July 202546,701
June 202549,490
May 202572,018
April 202585,866
March 202591,975
February 202573,748
January 202586,353
December 202474,396
November 202469,771
October 202479,425
September 202478,401
August 202461,129
July 202445,176
June 202459,307
May 202477,101
April 202498,579
March 202491,144
February 202474,494
January 202462,878

Source: EIA Form EIA-923, through August 2026.

How much of South Dakota's electricity comes from the Prevailing Wind Park plant?

Prevailing Wind Park made 3.9% of the 21,865,712 MWh reported by South Dakota plants in 2025, from 2.9% of the state's 7,670 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 11th largest of 54 plants in South Dakota, the 1,403rd largest of 14,327 in the U.S. and the 191st largest of 1,358 wind plants. By 2025 generation it is the 10th largest of 50 generating plants in the state.

Prevailing Wind Park within South Dakota, 2025
MeasureThis plantSouth DakotaShare
Capacity (MW)2207,6702.9%
Generation (MWh)850,79021,865,7123.9%
Wind capacity (MW)2203,4576.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Prevailing Wind Park plant, and when do they retire?

1 operable generator totals 220 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1220100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PWPSDOperatingOnshore Wind Turbine2202020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Prevailing Wind Park plant?

EIA lists no joint owners for Prevailing Wind Park. AES Distributed Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Prevailing Wind Park plant?

Prevailing Wind Park is in Lesterville, Yankton County, South Dakota, at 43.0390° N, 97.5260° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in South Dakota are similar in size?

South Dakota has 25 operable wind plants with 3,457 MW of capacity, and Prevailing Wind Park's 220 MW is 6% of that.

Wind plants in South Dakota around this size
PlantCountyMW2025 MWh
Dakota Range WindGrant3041,016,519
Deuel Harvest Wind Energy LLCDeuel3001,102,411
Triple H Wind ProjectHyde2501,030,948
Prevailing Wind ParkYankton220850,790
Buffalo Ridge II LLCBrookings210479,324
Crowned Ridge Wind II Energy CenterCodington201869,983
Crowned Ridge Wind Energy CenterCodington200811,568

Source: EIA Forms EIA-860 and EIA-923, 2025.