Wind power plant, South Dakota

Crowned Ridge Wind II Energy Center, South Dakota

Crowned Ridge Wind II Energy Center is a 201 MW wind power plant in Codington County, South Dakota, operated by Northern States Power Co-Minnesota, and it generated 869,983 MWh in 2025 (Forms EIA-860 and EIA-923). That is 4.0% of the generation reported in South Dakota, and its capacity factor sits at the 98th percentile of U.S. wind plants. By 2025 generation it ranks 814th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

201 MWNameplate capacity
50%Capacity factor, 2025, 98th percentile, on 201 MW net summer
4.0%Of SD generation, 2025
5 yearsAverage generator age, by MW

How hard does the Crowned Ridge Wind II Energy Center plant run compared with other wind plants?

The Crowned Ridge Wind II Energy Center plant had a capacity factor of 50% in 2025 on 201 MW of net summer capacity, the 98th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 181 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Crowned Ridge Wind II Energy Center50%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Crowned Ridge Wind II Energy Center plant generating more or less than last year?

Generation at Crowned Ridge Wind II Energy Center rose 4.2% from 2024 to 2025, from 834,567 MWh to 869,983 MWh. Through August 2026 it is running 1.2% behind the same months of 2025.

Net generation by period
PeriodMWh
2024834,567
2025869,983
2026 through August560,237
2025, same months566,755
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202651,000
July 202658,403
June 202659,459
May 202677,215
April 202674,676
March 202688,756
February 202670,651
January 202680,077
December 202584,494
November 202568,109
October 202590,180
September 202560,445
August 202550,559
July 202551,681
June 202550,581
May 202569,240
April 202583,464
March 202588,912
February 202575,331
January 202596,987
December 202473,294
November 202473,700
October 202486,085
September 202453,356
August 202458,867
July 202446,085
June 202463,192
May 202471,827
April 202491,145
March 202484,249
February 202470,476
January 202462,291

Source: EIA Form EIA-923, through August 2026.

How much of South Dakota's electricity comes from the Crowned Ridge Wind II Energy Center plant?

Crowned Ridge Wind II Energy Center made 4.0% of the 21,865,712 MWh reported by South Dakota plants in 2025, from 2.6% of the state's 7,670 MW of capacity. Its share of output is 1.5 times its share of capacity. By capacity it is the 14th largest of 54 plants in South Dakota, the 1,508th largest of 14,327 in the U.S. and the 261st largest of 1,358 wind plants. By 2025 generation it is the 9th largest of 50 generating plants in the state.

Crowned Ridge Wind II Energy Center within South Dakota, 2025
MeasureThis plantSouth DakotaShare
Capacity (MW)2017,6702.6%
Generation (MWh)869,98321,865,7124.0%
Wind capacity (MW)2013,4575.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Crowned Ridge Wind II Energy Center plant, and when do they retire?

1 operable generator totals 201 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1201100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CRW2OperatingOnshore Wind Turbine2012020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Crowned Ridge Wind II Energy Center plant?

EIA lists no joint owners for Crowned Ridge Wind II Energy Center. Northern States Power Co-Minnesota operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Northern States Power Co - Minnesota charge homes?

Northern States Power Co - Minnesota, the operator of Crowned Ridge Wind II Energy Center, had an average residential price of 13.13¢ per kWh and an average bill of $101 a month in 2025, 1% below the South Dakota average of 13.32¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst South Dakota
Northern States Power Co - Minnesota13.13¢$1011% lower
South Dakota average13.32¢$131
U.S. average17.23¢$15129% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Crowned Ridge Wind II Energy Center plant?

Crowned Ridge Wind II Energy Center is in Watertown, Codington County, South Dakota, at 45.0054° N, 96.9299° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in South Dakota are similar in size?

South Dakota has 25 operable wind plants with 3,457 MW of capacity, and Crowned Ridge Wind II Energy Center's 201 MW is 6% of that.

Wind plants in South Dakota around this size
PlantCountyMW2025 MWh
Triple H Wind ProjectHyde2501,030,948
Prevailing Wind ParkYankton220850,790
Buffalo Ridge II LLCBrookings210479,324
Crowned Ridge Wind II Energy CenterCodington201869,983
Crowned Ridge Wind Energy CenterCodington200811,568
Crocker Wind FarmClark200787,190
Sweetland Wind Farm, LLCHand200765,372

Source: EIA Forms EIA-860 and EIA-923, 2025.