Crowned Ridge Wind II Energy Center, South Dakota
Crowned Ridge Wind II Energy Center is a 201 MW wind power plant in Codington County, South Dakota, operated by Northern States Power Co-Minnesota, and it generated 869,983 MWh in 2025 (Forms EIA-860 and EIA-923). That is 4.0% of the generation reported in South Dakota, and its capacity factor sits at the 98th percentile of U.S. wind plants. By 2025 generation it ranks 814th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Crowned Ridge Wind II Energy Center plant run compared with other wind plants?
The Crowned Ridge Wind II Energy Center plant had a capacity factor of 50% in 2025 on 201 MW of net summer capacity, the 98th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 181 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Crowned Ridge Wind II Energy Center | 50% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Crowned Ridge Wind II Energy Center plant generating more or less than last year?
Generation at Crowned Ridge Wind II Energy Center rose 4.2% from 2024 to 2025, from 834,567 MWh to 869,983 MWh. Through August 2026 it is running 1.2% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 834,567 |
| 2025 | 869,983 |
| 2026 through August | 560,237 |
| 2025, same months | 566,755 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 51,000 |
| July 2026 | 58,403 |
| June 2026 | 59,459 |
| May 2026 | 77,215 |
| April 2026 | 74,676 |
| March 2026 | 88,756 |
| February 2026 | 70,651 |
| January 2026 | 80,077 |
| December 2025 | 84,494 |
| November 2025 | 68,109 |
| October 2025 | 90,180 |
| September 2025 | 60,445 |
| August 2025 | 50,559 |
| July 2025 | 51,681 |
| June 2025 | 50,581 |
| May 2025 | 69,240 |
| April 2025 | 83,464 |
| March 2025 | 88,912 |
| February 2025 | 75,331 |
| January 2025 | 96,987 |
| December 2024 | 73,294 |
| November 2024 | 73,700 |
| October 2024 | 86,085 |
| September 2024 | 53,356 |
| August 2024 | 58,867 |
| July 2024 | 46,085 |
| June 2024 | 63,192 |
| May 2024 | 71,827 |
| April 2024 | 91,145 |
| March 2024 | 84,249 |
| February 2024 | 70,476 |
| January 2024 | 62,291 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Crowned Ridge Wind II Energy Center plant, and when do they retire?
1 operable generator totals 201 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 201 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CRW2 | Operating | Onshore Wind Turbine | 201 | 2020 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Crowned Ridge Wind II Energy Center plant?
EIA lists no joint owners for Crowned Ridge Wind II Energy Center. Northern States Power Co-Minnesota operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Northern States Power Co - Minnesota charge homes?
Northern States Power Co - Minnesota, the operator of Crowned Ridge Wind II Energy Center, had an average residential price of 13.13¢ per kWh and an average bill of $101 a month in 2025, 1% below the South Dakota average of 13.32¢.
| Measure | Price | Monthly bill | Against South Dakota |
|---|---|---|---|
| Northern States Power Co - Minnesota | 13.13¢ | $101 | 1% lower |
| South Dakota average | 13.32¢ | $131 | |
| U.S. average | 17.23¢ | $151 | 29% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the Crowned Ridge Wind II Energy Center plant?
Crowned Ridge Wind II Energy Center is in Watertown, Codington County, South Dakota, at 45.0054° N, 96.9299° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in South Dakota are similar in size?
South Dakota has 25 operable wind plants with 3,457 MW of capacity, and Crowned Ridge Wind II Energy Center's 201 MW is 6% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Triple H Wind Project | Hyde | 250 | 1,030,948 |
| Prevailing Wind Park | Yankton | 220 | 850,790 |
| Buffalo Ridge II LLC | Brookings | 210 | 479,324 |
| Crowned Ridge Wind II Energy Center | Codington | 201 | 869,983 |
| Crowned Ridge Wind Energy Center | Codington | 200 | 811,568 |
| Crocker Wind Farm | Clark | 200 | 787,190 |
| Sweetland Wind Farm, LLC | Hand | 200 | 765,372 |
Source: EIA Forms EIA-860 and EIA-923, 2025.