Northern Iowa Windpower II is a 80 MW wind power plant in Worth County, Iowa, operated by Avangrid Power LLC, and it generated 134,253 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Iowa, and its capacity factor sits at the 10th percentile of U.S. wind plants. By 2025 generation it ranks 3,071st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

80 MWNameplate capacity
19%Capacity factor, 2025, 10th percentile, on 80 MW net summer
0.2%Of IA generation, 2025
17 yearsAverage generator age, by MW

How hard does the Northern Iowa Windpower II plant run compared with other wind plants?

The Northern Iowa Windpower II plant had a capacity factor of 19% in 2025 on 80 MW of net summer capacity, the 10th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 70 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Northern Iowa Windpower II19%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Northern Iowa Windpower II plant generating more or less than last year?

Generation at Northern Iowa Windpower II rose 3.1% from 2024 to 2025, from 130,225 MWh to 134,253 MWh.

Net generation by period
PeriodMWh
2024130,225
2025134,253
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202519,272
November 202513,123
October 202512,906
September 20257,070
August 20257,068
July 20255,784
June 20257,953
May 20256,529
April 202513,910
March 202517,226
February 202511,498
January 202511,914
December 202415,617
November 202413,196
October 202412,898
September 20248,489
August 20248,697
July 20246,677
June 202410,587
May 20249,644
April 202410,842
March 202411,634
February 202412,400
January 20249,544

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Northern Iowa Windpower II plant?

Northern Iowa Windpower II made 0.2% of the 74,502,373 MWh reported by Iowa plants in 2025, from 0.3% of the state's 24,817 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 91st largest of 306 plants in Iowa, the 2,965th largest of 14,327 in the U.S. and the 748th largest of 1,358 wind plants. By 2025 generation it is the 92nd largest of 283 generating plants in the state.

Northern Iowa Windpower II within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)8024,8170.3%
Generation (MWh)134,25374,502,3730.2%
Wind capacity (MW)8013,4100.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Northern Iowa Windpower II plant, and when do they retire?

1 operable generator totals 80 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s180100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
TOI2OperatingOnshore Wind Turbine802008n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Northern Iowa Windpower II plant?

EIA lists no joint owners for Northern Iowa Windpower II. Avangrid Power LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Northern Iowa Windpower II plant?

Northern Iowa Windpower II is in Kensett, Worth County, Iowa, at 43.3608° N, 93.2978° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and Northern Iowa Windpower II's 80 MW is 1% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
Ivester Wind FarmGrundy91328,083
Storm Lake IIBuena Vista80114,614
Old Gold Energy Center, LLCWorth8057,131
Northern Iowa Windpower IIWorth80134,253
Charles City Wind FarmFloyd80267,700
Pocahontas Prairie Wind FarmPocahontas80373,500
Sac County Wind, LLCSac80321,002

Source: EIA Forms EIA-860 and EIA-923, 2025.