Old Gold Energy Center, LLC is a 80 MW wind power plant in Worth County, Iowa, operated by Old Gold Energy Center, LLC, and it generated 57,131 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Iowa, and its capacity factor sits at the 2nd percentile of U.S. wind plants. By 2025 generation it ranks 3,922nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

80 MWNameplate capacity
8%Capacity factor, 2025, 2nd percentile, on 80 MW net summer
0.1%Of IA generation, 2025
24 yearsAverage generator age, by MW

How hard does the Old Gold Energy Center, LLC plant run compared with other wind plants?

The Old Gold Energy Center, LLC plant had a capacity factor of 8% in 2025 on 80 MW of net summer capacity, the 2nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 30 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Old Gold Energy Center, LLC8%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Old Gold Energy Center, LLC plant generating more or less than last year?

Generation at Old Gold Energy Center, LLC fell 27.1% from 2024 to 2025, from 78,406 MWh to 57,131 MWh.

Net generation by period
PeriodMWh
202478,406
202557,131
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20254,918
November 20255,613
October 20254,879
September 20252,628
August 20252,103
July 20251,312
June 20251,785
May 20251,445
April 20259,863
March 20259,522
February 20254,682
January 20258,381
December 20247,935
November 20244,535
October 20247,407
September 20246,243
August 20244,302
July 20242,491
June 20243,940
May 20244,761
April 20248,632
March 20249,268
February 202410,385
January 20248,507

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Old Gold Energy Center, LLC plant?

Old Gold Energy Center, LLC made 0.1% of the 74,502,373 MWh reported by Iowa plants in 2025, from 0.3% of the state's 24,817 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 91st largest of 306 plants in Iowa, the 2,965th largest of 14,327 in the U.S. and the 747th largest of 1,358 wind plants. By 2025 generation it is the 105th largest of 283 generating plants in the state.

Old Gold Energy Center, LLC within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)8024,8170.3%
Generation (MWh)57,13174,502,3730.1%
Wind capacity (MW)8013,4100.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Old Gold Energy Center, LLC plant, and when do they retire?

1 operable generator totals 80 MW, with an average age of 24 years weighted by capacity at the end of 2025. 80 MW, 100% of operable capacity, has a planned retirement, the first in 2027.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s180100%2027
Capacity retiring by year
YearUnitsMW retiringShare of plant
2027180100%
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
NMOperatingOnshore Wind Turbine8020012027

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Old Gold Energy Center, LLC plant?

EIA lists no joint owners for Old Gold Energy Center, LLC. Old Gold Energy Center, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Old Gold Energy Center, LLC plant?

Old Gold Energy Center, LLC is in Joice, Worth County, Iowa, at 43.3833° N, 93.4167° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and Old Gold Energy Center, LLC's 80 MW is 1% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
Hancock County Wind Energy CenterHancock98255,466
Ivester Wind FarmGrundy91328,083
Storm Lake IIBuena Vista80114,614
Old Gold Energy Center, LLCWorth8057,131
Northern Iowa Windpower IIWorth80134,253
Charles City Wind FarmFloyd80267,700
Pocahontas Prairie Wind FarmPocahontas80373,500

Source: EIA Forms EIA-860 and EIA-923, 2025.