Hancock County Wind Energy Center, Iowa

Hancock County Wind Energy Center is a 98 MW wind power plant in Hancock County, Iowa, operated by FPL Energy Hancock County Wind, LLC, and it generated 255,466 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Iowa, and its capacity factor sits at the 37th percentile of U.S. wind plants. By 2025 generation it ranks 2,195th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

98 MWNameplate capacity
30%Capacity factor, 2025, 37th percentile, on 98 MW net summer
0.3%Of IA generation, 2025
23 yearsAverage generator age, by MW

How hard does the Hancock County Wind Energy Center plant run compared with other wind plants?

The Hancock County Wind Energy Center plant had a capacity factor of 30% in 2025 on 98 MW of net summer capacity, the 37th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 109 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hancock County Wind Energy Center30%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hancock County Wind Energy Center plant generating more or less than last year?

Generation at Hancock County Wind Energy Center fell 4.8% from 2024 to 2025, from 268,412 MWh to 255,466 MWh. Through August 2026 it is running 4.7% behind the same months of 2025.

Net generation by period
PeriodMWh
2024268,412
2025255,466
2026 through August155,838
2025, same months163,594
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20266,175
July 20265,588
June 202615,471
May 202620,364
April 202629,043
March 202630,359
February 202622,532
January 202626,306
December 202528,741
November 202526,481
October 202525,440
September 202511,210
August 20258,577
July 20253,610
June 202517,169
May 202517,136
April 202530,644
March 202533,458
February 202522,953
January 202530,047
December 202422,275
November 202424,886
October 202429,552
September 202414,941
August 202410,240
July 20248,519
June 202419,920
May 202420,537
April 202435,614
March 202432,739
February 202427,000
January 202422,189

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Hancock County Wind Energy Center plant?

Hancock County Wind Energy Center made 0.3% of the 74,502,373 MWh reported by Iowa plants in 2025, from 0.4% of the state's 24,817 MW of capacity. By capacity it is the 86th largest of 306 plants in Iowa, the 2,771st largest of 14,327 in the U.S. and the 709th largest of 1,358 wind plants. By 2025 generation it is the 76th largest of 283 generating plants in the state.

Hancock County Wind Energy Center within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)9824,8170.4%
Generation (MWh)255,46674,502,3730.3%
Wind capacity (MW)9813,4100.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hancock County Wind Energy Center plant, and when do they retire?

1 operable generator totals 98 MW, with an average age of 23 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s198100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
V-47OperatingOnshore Wind Turbine982002n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hancock County Wind Energy Center plant?

EIA lists no joint owners for Hancock County Wind Energy Center. FPL Energy Hancock County Wind, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Hancock County Wind Energy Center plant?

Hancock County Wind Energy Center is in Garner, Hancock County, Iowa, at 43.0528° N, 93.6300° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and Hancock County Wind Energy Center's 98 MW is 1% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
Crane Creek Wind Energy CenterHoward99284,033
Franklin County Wind FarmFranklin99270,522
Osceola Windpower LLCOsceola98393,767
Hancock County Wind Energy CenterHancock98255,466
Ivester Wind FarmGrundy91328,083
Storm Lake IIBuena Vista80114,614
Old Gold Energy Center, LLCWorth8057,131

Source: EIA Forms EIA-860 and EIA-923, 2025.