Ivester Wind Farm, Iowa

Ivester Wind Farm is a 90.8 MW wind power plant in Grundy County, Iowa, operated by MidAmerican Energy Co, and it generated 328,083 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Iowa, and its capacity factor sits at the 80th percentile of U.S. wind plants. By 2025 generation it ranks 1,854th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

90.8 MWNameplate capacity
42%Capacity factor, 2025, 80th percentile, on 90 MW net summer
0.4%Of IA generation, 2025
7 yearsAverage generator age, by MW

How hard does the Ivester Wind Farm plant run compared with other wind plants?

The Ivester Wind Farm plant had a capacity factor of 42% in 2025 on 90 MW of net summer capacity, the 80th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 152 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Ivester Wind Farm42%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Ivester Wind Farm plant generating more or less than last year?

Generation at Ivester Wind Farm fell 3.7% from 2024 to 2025, from 340,736 MWh to 328,083 MWh. Through August 2026 it is running 2.4% behind the same months of 2025.

Net generation by period
PeriodMWh
2024340,736
2025328,083
2026 through August208,938
2025, same months214,142
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202614,488
July 202610,345
June 202622,798
May 202629,167
April 202637,777
March 202634,903
February 202628,133
January 202631,327
December 202534,970
November 202532,196
October 202529,885
September 202516,890
August 202513,209
July 202513,589
June 202520,943
May 202523,863
April 202536,605
March 202538,317
February 202531,754
January 202535,862
December 202428,132
November 202431,407
October 202438,820
September 202422,203
August 202416,766
July 202410,056
June 202426,347
May 202427,211
April 202441,018
March 202440,897
February 202433,470
January 202424,409

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Ivester Wind Farm plant?

Ivester Wind Farm made 0.4% of the 74,502,373 MWh reported by Iowa plants in 2025, from 0.4% of the state's 24,817 MW of capacity. Its share of output is 1.2 times its share of capacity. By capacity it is the 87th largest of 306 plants in Iowa, the 2,843rd largest of 14,327 in the U.S. and the 725th largest of 1,358 wind plants. By 2025 generation it is the 62nd largest of 283 generating plants in the state.

Ivester Wind Farm within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)9124,8170.4%
Generation (MWh)328,08374,502,3730.4%
Wind capacity (MW)9113,4100.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Ivester Wind Farm plant, and when do they retire?

1 operable generator totals 90.8 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s191100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
WT1OperatingOnshore Wind Turbine912018n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Ivester Wind Farm plant?

EIA lists no joint owners for Ivester Wind Farm. MidAmerican Energy Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does MidAmerican Energy Co charge homes?

MidAmerican Energy Co, the operator of Ivester Wind Farm, had an average residential price of 11.21¢ per kWh and an average bill of $93 a month in 2025, 18% below the Iowa average of 13.62¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Iowa
MidAmerican Energy Co11.21¢$9318% lower
Iowa average13.62¢$117
U.S. average17.23¢$15126% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Ivester Wind Farm plant?

Ivester Wind Farm is in Wellsburg, Grundy County, Iowa, at 42.3333° N, 92.9464° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and Ivester Wind Farm's 90.8 MW is 1% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
Franklin County Wind FarmFranklin99270,522
Osceola Windpower LLCOsceola98393,767
Hancock County Wind Energy CenterHancock98255,466
Ivester Wind FarmGrundy91328,083
Storm Lake IIBuena Vista80114,614
Old Gold Energy Center, LLCWorth8057,131
Northern Iowa Windpower IIWorth80134,253