Solar power plant, Nevada

Playa Solar 1, LLC power plant, Nevada

Playa Solar 1, LLC is a 79 MW solar power plant in Clark County, Nevada, operated by EDF Renewable Asset Holdings, Inc., and it generated 183,341 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Nevada, and its capacity factor sits at the 75th percentile of U.S. solar plants. By 2025 generation it ranks 2,615th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

79 MWNameplate capacity
26%Capacity factor, 2025, 75th percentile, on 79 MW net summer
0.4%Of NV generation, 2025
8 yearsAverage generator age, by MW

How hard does the Playa Solar 1, LLC plant run compared with other solar plants?

The Playa Solar 1, LLC plant had a capacity factor of 26% in 2025 on 79 MW of net summer capacity, the 75th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 97 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Playa Solar 1, LLC26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Playa Solar 1, LLC plant generating more or less than last year?

Generation at Playa Solar 1, LLC rose 1.1% from 2024 to 2025, from 181,403 MWh to 183,341 MWh. Through August 2026 it is running 2.3% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024181,403
2025183,341
2026 through August138,422
2025, same months135,286
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202617,799
July 202620,266
June 202621,899
May 202623,768
April 202617,878
March 202616,957
February 202611,099
January 20268,756
December 20258,417
November 20258,608
October 202514,596
September 202516,434
August 202519,202
July 202521,456
June 202521,609
May 202518,524
April 202516,648
March 202515,669
February 202512,012
January 202510,166
December 20248,466
November 20249,736
October 202413,000
September 202416,096
August 202418,730
July 202419,826
June 202420,849
May 202422,310
April 202419,440
March 202414,565
February 202410,035
January 20248,350

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Playa Solar 1, LLC plant?

Playa Solar 1, LLC made 0.4% of the 45,180,066 MWh reported by Nevada plants in 2025, from 0.4% of the state's 18,959 MW of capacity. By capacity it is the 49th largest of 117 plants in Nevada, the 3,047th largest of 14,327 in the U.S. and the 569th largest of 7,223 solar plants. By 2025 generation it is the 47th largest of 112 generating plants in the state.

Playa Solar 1, LLC within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)7918,9590.4%
Generation (MWh)183,34145,180,0660.4%
Solar capacity (MW)795,1951.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Playa Solar 1, LLC plant, and when do they retire?

1 operable generator totals 79 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s179100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN01OperatingSolar Photovoltaic792017n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Playa Solar 1, LLC plant?

EIA lists no joint owners for Playa Solar 1, LLC. EDF Renewable Asset Holdings, Inc. operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Playa Solar 1, LLC plant?

Playa Solar 1, LLC is in North Las Vegas, Clark County, Nevada, at 36.4080° N, 114.9080° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Playa Solar 1, LLC's 79 MW is 2% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Harry Allen Solar Energy LLCClark100296,941
Fish SpringsWashoe100220,393
Copper Mountain Solar 4, LLCClark94248,302
Playa Solar 1, LLCClark79183,341
Nevada Solar OneClark7688,894
Turquoise Nevada, LLCWashoe60108,716
Silver State Solar Power NorthClark52113,384

Source: EIA Forms EIA-860 and EIA-923, 2025.