Nevada Solar One power plant, Nevada

Nevada Solar One is a 75.7 MW solar power plant in Clark County, Nevada, operated by Acciona Solar Power, and it generated 89,492 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Nevada, and its capacity factor sits at the 12th percentile of U.S. solar plants. By 2025 generation it ranks 3,517th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

75.7 MWNameplate capacity
15%Capacity factor, 2025, 12th percentile, on 68.5 MW net summer
0.2%Of NV generation, 2025
18 yearsAverage generator age, by MW

How hard does the Nevada Solar One plant run compared with other solar plants?

The Nevada Solar One plant had a capacity factor of 15% in 2025 on 68.5 MW of net summer capacity, the 12th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 54 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Nevada Solar One15%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Nevada Solar One plant generating more or less than last year?

Generation at Nevada Solar One fell 3.1% from 2024 to 2025, from 92,383 MWh to 89,492 MWh. Through August 2026 it is running 4.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202492,383
202589,492
2026 through August73,281
2025, same months70,221
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20267,786
July 202610,708
June 202614,581
May 202615,182
April 202610,753
March 20269,093
February 20263,695
January 20261,483
December 20251,307
November 20252,606
October 20256,964
September 20258,394
August 202510,037
July 202513,797
June 202513,170
May 202512,286
April 20259,161
March 20256,024
February 20254,323
January 20251,423
December 20241,466
November 20243,350
October 20246,384
September 20248,564
August 20249,141
July 202410,925
June 202414,318
May 202416,194
April 202412,403
March 20245,391
February 20243,013
January 20241,234

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Nevada Solar One plant?

Nevada Solar One made 0.2% of the 45,180,066 MWh reported by Nevada plants in 2025, from 0.4% of the state's 18,959 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 50th largest of 117 plants in Nevada, the 3,094th largest of 14,327 in the U.S. and the 579th largest of 7,223 solar plants. By 2025 generation it is the 62nd largest of 112 generating plants in the state.

Nevada Solar One within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)7618,9590.4%
Generation (MWh)89,49245,180,0660.2%
Solar capacity (MW)765,1951.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Nevada Solar One plant, and when do they retire?

1 operable generator totals 75.7 MW, with an average age of 18 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s176100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ONEOperatingSolar Thermal without Energy Storage762007n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Nevada Solar One plant?

EIA lists no joint owners for Nevada Solar One. Acciona Solar Power operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Nevada Solar One plant?

Nevada Solar One is in Boulder City, Clark County, Nevada, at 35.7998° N, 114.9817° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Nevada Solar One's 75.7 MW is 1% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Fish SpringsWashoe100220,393
Copper Mountain Solar 4, LLCClark94248,302
Playa Solar 1, LLCClark79183,341
Nevada Solar OneClark7688,894
Turquoise Nevada, LLCWashoe60108,716
Silver State Solar Power NorthClark52113,384