Solar power plant, Nevada
Nevada Solar One power plant, Nevada
Nevada Solar One is a 75.7 MW solar power plant in Clark County, Nevada, operated by Acciona Solar Power, and it generated 89,492 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Nevada, and its capacity factor sits at the 12th percentile of U.S. solar plants. By 2025 generation it ranks 3,517th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Nevada Solar One plant run compared with other solar plants?
The Nevada Solar One plant had a capacity factor of 15% in 2025 on 68.5 MW of net summer capacity, the 12th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 54 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Nevada Solar One | 15% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Nevada Solar One plant generating more or less than last year?
Generation at Nevada Solar One fell 3.1% from 2024 to 2025, from 92,383 MWh to 89,492 MWh. Through August 2026 it is running 4.4% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 92,383 |
| 2025 | 89,492 |
| 2026 through August | 73,281 |
| 2025, same months | 70,221 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 7,786 |
| July 2026 | 10,708 |
| June 2026 | 14,581 |
| May 2026 | 15,182 |
| April 2026 | 10,753 |
| March 2026 | 9,093 |
| February 2026 | 3,695 |
| January 2026 | 1,483 |
| December 2025 | 1,307 |
| November 2025 | 2,606 |
| October 2025 | 6,964 |
| September 2025 | 8,394 |
| August 2025 | 10,037 |
| July 2025 | 13,797 |
| June 2025 | 13,170 |
| May 2025 | 12,286 |
| April 2025 | 9,161 |
| March 2025 | 6,024 |
| February 2025 | 4,323 |
| January 2025 | 1,423 |
| December 2024 | 1,466 |
| November 2024 | 3,350 |
| October 2024 | 6,384 |
| September 2024 | 8,564 |
| August 2024 | 9,141 |
| July 2024 | 10,925 |
| June 2024 | 14,318 |
| May 2024 | 16,194 |
| April 2024 | 12,403 |
| March 2024 | 5,391 |
| February 2024 | 3,013 |
| January 2024 | 1,234 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Nevada Solar One plant, and when do they retire?
1 operable generator totals 75.7 MW, with an average age of 18 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 76 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| ONE | Operating | Solar Thermal without Energy Storage | 76 | 2007 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Nevada Solar One plant?
EIA lists no joint owners for Nevada Solar One. Acciona Solar Power operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Nevada Solar One plant?
Nevada Solar One is in Boulder City, Clark County, Nevada, at 35.7998° N, 114.9817° W. It sits in the Nevada Power Company balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Nevada are similar in size?
Nevada has 58 operable solar plants with 5,195 MW of capacity, and Nevada Solar One's 75.7 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Fish Springs | Washoe | 100 | 220,393 |
| Copper Mountain Solar 4, LLC | Clark | 94 | 248,302 |
| Playa Solar 1, LLC | Clark | 79 | 183,341 |
| Nevada Solar One | Clark | 76 | 88,894 |
| Turquoise Nevada, LLC | Washoe | 60 | 108,716 |
| Silver State Solar Power North | Clark | 52 | 113,384 |
| Boulder Solar II, LLC | Clark | 50 | 110,547 |
Source: EIA Forms EIA-860 and EIA-923, 2025.