Solar power plant, Nevada
Turquoise Nevada, LLC solar power plant, Nevada
Turquoise Nevada, LLC is a 60 MW solar power plant in Washoe County, Nevada, operated by Greenbacker Renewable Energy Corporation, and it generated 108,716 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Nevada, and its capacity factor sits at the 30th percentile of U.S. solar plants. By 2025 generation it ranks 3,304th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Turquoise Nevada, LLC plant run compared with other solar plants?
The Turquoise Nevada, LLC plant had a capacity factor of 21% in 2025 on 60 MW of net summer capacity, the 30th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 75 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Turquoise Nevada, LLC | 21% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Turquoise Nevada, LLC plant generating more or less than last year?
Generation at Turquoise Nevada, LLC rose 2.5% from 2024 to 2025, from 106,014 MWh to 108,716 MWh. Through August 2026 it is running 1.2% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 106,014 |
| 2025 | 108,716 |
| 2026 through August | 77,340 |
| 2025, same months | 78,286 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 10,285 |
| July 2026 | 10,893 |
| June 2026 | 11,353 |
| May 2026 | 10,825 |
| April 2026 | 10,287 |
| March 2026 | 10,257 |
| February 2026 | 6,451 |
| January 2026 | 6,989 |
| December 2025 | 6,827 |
| November 2025 | 6,246 |
| October 2025 | 8,375 |
| September 2025 | 8,982 |
| August 2025 | 10,622 |
| July 2025 | 11,172 |
| June 2025 | 11,234 |
| May 2025 | 11,467 |
| April 2025 | 10,198 |
| March 2025 | 8,729 |
| February 2025 | 7,537 |
| January 2025 | 7,327 |
| December 2024 | 5,516 |
| November 2024 | 5,714 |
| October 2024 | 8,899 |
| September 2024 | 9,862 |
| August 2024 | 10,984 |
| July 2024 | 11,015 |
| June 2024 | 10,993 |
| May 2024 | 12,065 |
| April 2024 | 10,443 |
| March 2024 | 8,963 |
| February 2024 | 6,834 |
| January 2024 | 4,726 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Turquoise Nevada, LLC plant, and when do they retire?
1 operable generator totals 60 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 60 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 142 | Operating | Solar Photovoltaic | 60 | 2020 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Turquoise Nevada, LLC plant?
EIA lists no joint owners for Turquoise Nevada, LLC. Greenbacker Renewable Energy Corporation operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Turquoise Nevada, LLC plant?
Turquoise Nevada, LLC is in Sparks, Washoe County, Nevada, at 39.5740° N, 119.5242° W. It sits in the Nevada Power Company balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Nevada are similar in size?
Nevada has 58 operable solar plants with 5,195 MW of capacity, and Turquoise Nevada, LLC's 60 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Copper Mountain Solar 4, LLC | Clark | 94 | 248,302 |
| Playa Solar 1, LLC | Clark | 79 | 183,341 |
| Nevada Solar One | Clark | 76 | 88,894 |
| Turquoise Nevada, LLC | Washoe | 60 | 108,716 |
| Silver State Solar Power North | Clark | 52 | 113,384 |
| Boulder Solar II, LLC | Clark | 50 | 110,547 |
| Luning Energy | Mineral | 50 | 102,129 |
Source: EIA Forms EIA-860 and EIA-923, 2025.