Solar power plant, Nevada

Turquoise Nevada, LLC solar power plant, Nevada

Turquoise Nevada, LLC is a 60 MW solar power plant in Washoe County, Nevada, operated by Greenbacker Renewable Energy Corporation, and it generated 108,716 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Nevada, and its capacity factor sits at the 30th percentile of U.S. solar plants. By 2025 generation it ranks 3,304th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

60 MWNameplate capacity
21%Capacity factor, 2025, 30th percentile, on 60 MW net summer
0.2%Of NV generation, 2025
5 yearsAverage generator age, by MW

How hard does the Turquoise Nevada, LLC plant run compared with other solar plants?

The Turquoise Nevada, LLC plant had a capacity factor of 21% in 2025 on 60 MW of net summer capacity, the 30th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 75 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Turquoise Nevada, LLC21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Turquoise Nevada, LLC plant generating more or less than last year?

Generation at Turquoise Nevada, LLC rose 2.5% from 2024 to 2025, from 106,014 MWh to 108,716 MWh. Through August 2026 it is running 1.2% behind the same months of 2025.

Net generation by period
PeriodMWh
2024106,014
2025108,716
2026 through August77,340
2025, same months78,286
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202610,285
July 202610,893
June 202611,353
May 202610,825
April 202610,287
March 202610,257
February 20266,451
January 20266,989
December 20256,827
November 20256,246
October 20258,375
September 20258,982
August 202510,622
July 202511,172
June 202511,234
May 202511,467
April 202510,198
March 20258,729
February 20257,537
January 20257,327
December 20245,516
November 20245,714
October 20248,899
September 20249,862
August 202410,984
July 202411,015
June 202410,993
May 202412,065
April 202410,443
March 20248,963
February 20246,834
January 20244,726

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Turquoise Nevada, LLC plant?

Turquoise Nevada, LLC made 0.2% of the 45,180,066 MWh reported by Nevada plants in 2025, from 0.3% of the state's 18,959 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 54th largest of 117 plants in Nevada, the 3,517th largest of 14,327 in the U.S. and the 813th largest of 7,223 solar plants. By 2025 generation it is the 55th largest of 112 generating plants in the state.

Turquoise Nevada, LLC within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)6018,9590.3%
Generation (MWh)108,71645,180,0660.2%
Solar capacity (MW)605,1951.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Turquoise Nevada, LLC plant, and when do they retire?

1 operable generator totals 60 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s160100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
142OperatingSolar Photovoltaic602020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Turquoise Nevada, LLC plant?

EIA lists no joint owners for Turquoise Nevada, LLC. Greenbacker Renewable Energy Corporation operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Turquoise Nevada, LLC plant?

Turquoise Nevada, LLC is in Sparks, Washoe County, Nevada, at 39.5740° N, 119.5242° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Turquoise Nevada, LLC's 60 MW is 1% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Copper Mountain Solar 4, LLCClark94248,302
Playa Solar 1, LLCClark79183,341
Nevada Solar OneClark7688,894
Turquoise Nevada, LLCWashoe60108,716
Silver State Solar Power NorthClark52113,384
Boulder Solar II, LLCClark50110,547
Luning EnergyMineral50102,129

Source: EIA Forms EIA-860 and EIA-923, 2025.