Solar power plant, Nevada

Boulder Solar II, LLC power plant, Nevada

Boulder Solar II, LLC is a 50 MW solar power plant in Clark County, Nevada, operated by Invenergy Services LLC, and it generated 110,547 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Nevada, and its capacity factor sits at the 66th percentile of U.S. solar plants. By 2025 generation it ranks 3,286th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

50 MWNameplate capacity
25%Capacity factor, 2025, 66th percentile, on 50 MW net summer
0.2%Of NV generation, 2025
8 yearsAverage generator age, by MW

How hard does the Boulder Solar II, LLC plant run compared with other solar plants?

The Boulder Solar II, LLC plant had a capacity factor of 25% in 2025 on 50 MW of net summer capacity, the 66th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 92 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Boulder Solar II, LLC25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Boulder Solar II, LLC plant generating more or less than last year?

Generation at Boulder Solar II, LLC fell 9.9% from 2024 to 2025, from 122,696 MWh to 110,547 MWh. Through August 2026 it is running 13.6% behind the same months of 2025.

Net generation by period
PeriodMWh
2024122,696
2025110,547
2026 through August70,190
2025, same months81,192
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20269,782
July 202611,495
June 202612,604
May 20265,471
April 202610,333
March 20269,368
February 20266,108
January 20265,029
December 20255,032
November 20255,477
October 20259,128
September 20259,718
August 202511,590
July 202513,233
June 202513,525
May 202512,108
April 202510,895
March 20258,512
February 20256,467
January 20254,862
December 20245,069
November 20246,543
October 20249,265
September 202411,351
August 202412,604
July 202413,933
June 202414,778
May 202412,841
April 202413,442
March 202410,059
February 20246,876
January 20245,935

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Boulder Solar II, LLC plant?

Boulder Solar II, LLC made 0.2% of the 45,180,066 MWh reported by Nevada plants in 2025, from 0.3% of the state's 18,959 MW of capacity. By capacity it is the 57th largest of 117 plants in Nevada, the 3,754th largest of 14,327 in the U.S. and the 876th largest of 7,223 solar plants. By 2025 generation it is the 54th largest of 112 generating plants in the state.

Boulder Solar II, LLC within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)5018,9590.3%
Generation (MWh)110,54745,180,0660.2%
Solar capacity (MW)505,1951.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Boulder Solar II, LLC plant, and when do they retire?

1 operable generator totals 50 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BSIIOperatingSolar Photovoltaic502017n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Boulder Solar II, LLC plant?

EIA lists no joint owners for Boulder Solar II, LLC. Invenergy Services LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Boulder Solar II, LLC plant?

Boulder Solar II, LLC is in Boulder City, Clark County, Nevada, at 35.8500° N, 114.9440° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Boulder Solar II, LLC's 50 MW is 1% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Nevada Solar OneClark7688,894
Turquoise Nevada, LLCWashoe60108,716
Silver State Solar Power NorthClark52113,384
Boulder Solar II, LLCClark50110,547
Luning EnergyMineral50102,129
Techren Solar VClark50107,986
CM48Clark4889,650

Source: EIA Forms EIA-860 and EIA-923, 2025.