Skip to main content
RateWatt

Solar power plant, Nevada

Techren Solar V power plant, Nevada

Techren Solar V is a 50 MW solar power plant in Clark County, Nevada, operated by Techren Solar V LLC, and it generated 107,986 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Nevada, and its capacity factor sits at the 62nd percentile of U.S. solar plants. By 2025 generation it ranks 3,309th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

50 MWNameplate capacity
25%Capacity factor, 2025, 62nd percentile, on 50 MW net summer
0.2%Of NV generation, 2025
5 yearsAverage generator age, by MW

How hard does the Techren Solar V plant run compared with other solar plants?

The Techren Solar V plant had a capacity factor of 25% in 2025 on 50 MW of net summer capacity, the 62nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 90 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Techren Solar V25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Techren Solar V plant generating more or less than last year?

Generation at Techren Solar V fell 7.6% from 2024 to 2025, from 116,924 MWh to 107,986 MWh. Through August 2026 it is running 14.3% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024116,924
2025107,986
2026 through August85,349
2025, same months74,685
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20269,700
July 202612,114
June 202613,684
May 202614,427
April 202612,427
March 20269,977
February 20266,397
January 20266,623
December 20256,350
November 20256,294
October 20259,860
September 202510,797
August 202510,173
July 2025956
June 202513,421
May 202511,828
April 202513,283
March 202510,946
February 20258,040
January 20256,038
December 20245,135
November 20246,073
October 20248,521
September 20249,761
August 202411,214
July 202411,240
June 202413,026
May 202415,916
April 202412,800
March 202410,243
February 20247,343
January 20245,652

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Techren Solar V plant?

Techren Solar V made 0.2% of the 45,180,066 MWh reported by Nevada plants in 2025, from 0.3% of the state's 18,959 MW of capacity. By capacity it is the 57th largest of 117 plants in Nevada, the 3,754th largest of 14,327 in the U.S. and the 885th largest of 7,223 solar plants. By 2025 generation it is the 56th largest of 112 generating plants in the state.

Techren Solar V within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)5018,9590.3%
Generation (MWh)107,98645,180,0660.2%
Solar capacity (MW)505,1951.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Techren Solar V plant, and when do they retire?

1 operable generator totals 50 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
TECH5OperatingSolar Photovoltaic502020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Techren Solar V plant?

Kkr/Ga is the only joint owner reported for Techren Solar V, with 100.0%. Techren Solar V LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Techren Solar V plant?

Techren Solar V is in Boulder, Clark County, Nevada, at 35.8997° N, 114.9262° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Techren Solar V's 50 MW is 1% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Silver State Solar Power NorthClark52113,384
Boulder Solar II, LLCClark50110,547
Luning EnergyMineral50102,129
Techren Solar VClark50107,986
CM48Clark4889,650
Spectrum Solar PV Power ProjectClark3081,819
Techren Solar III LLCClark2553,970