Techren Solar III LLC power plant, Nevada

Techren Solar III LLC is a 25 MW solar power plant in Clark County, Nevada, operated by Techren Solar III LLC, and it generated 53,970 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Nevada, and its capacity factor sits at the 62nd percentile of U.S. solar plants. By 2025 generation it ranks 3,999th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

25 MWNameplate capacity
25%Capacity factor, 2025, 62nd percentile, on 25 MW net summer
0.1%Of NV generation, 2025
5 yearsAverage generator age, by MW

How hard does the Techren Solar III LLC plant run compared with other solar plants?

The Techren Solar III LLC plant had a capacity factor of 25% in 2025 on 25 MW of net summer capacity, the 62nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 90 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Techren Solar III LLC25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Techren Solar III LLC plant generating more or less than last year?

Generation at Techren Solar III LLC fell 10.6% from 2024 to 2025, from 60,369 MWh to 53,970 MWh. Through August 2026 it is running 9.2% behind the same months of 2025.

Net generation by period
PeriodMWh
202460,369
202553,970
2026 through August36,957
2025, same months40,713
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20265,164
July 20264,098
June 20265,975
May 20265,513
April 20264,333
March 20265,568
February 20263,348
January 20262,958
December 20252,622
November 20252,573
October 20253,739
September 20254,323
August 20255,592
July 20255,764
June 20256,850
May 20255,849
April 20254,114
March 20255,467
February 20253,989
January 20253,088
December 20242,621
November 20243,405
October 20244,576
September 20245,436
August 20245,507
July 20245,562
June 20247,219
May 20247,809
April 20246,223
March 20245,245
February 20243,592
January 20243,174

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Techren Solar III LLC plant?

Techren Solar III LLC made 0.1% of the 45,180,066 MWh reported by Nevada plants in 2025, from 0.1% of the state's 18,959 MW of capacity. By capacity it is the 74th largest of 117 plants in Nevada, the 4,556th largest of 14,327 in the U.S. and the 1,049th largest of 7,223 solar plants. By 2025 generation it is the 76th largest of 112 generating plants in the state.

Techren Solar III LLC within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)2518,9590.1%
Generation (MWh)53,97045,180,0660.1%
Solar capacity (MW)255,1950.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Techren Solar III LLC plant, and when do they retire?

1 operable generator totals 25 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s125100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
TECH3OperatingSolar Photovoltaic252020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Techren Solar III LLC plant?

Kkr/Ga is the only joint owner reported for Techren Solar III LLC, with 100.0%. Techren Solar III LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Techren Solar III LLC plant?

Techren Solar III LLC is in Boulder, Clark County, Nevada, at 35.8441° N, 114.9713° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Techren Solar III LLC's 25 MW is 0% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Techren Solar VClark50107,986
CM48Clark4889,650
Spectrum Solar PV Power ProjectClark3081,819
Techren Solar III LLCClark2553,970
Techren Solar IV LLCClark2553,892
Apex Solar PV Power ProjectClark2047,970
Mountain View SolarClark2051,415

Source: EIA Forms EIA-860 and EIA-923, 2025.