Solar power plant, Nevada
Apex Solar PV Power Project, Nevada
Apex Solar PV Power Project is a 20 MW solar power plant in Clark County, Nevada, operated by Southern Power Co, and it generated 47,970 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Nevada, and its capacity factor sits at the 79th percentile of U.S. solar plants. By 2025 generation it ranks 4,149th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Apex Solar PV Power Project plant run compared with other solar plants?
The Apex Solar PV Power Project plant had a capacity factor of 27% in 2025 on 20 MW of net summer capacity, the 79th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 100 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Apex Solar PV Power Project | 27% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Apex Solar PV Power Project plant generating more or less than last year?
Generation at Apex Solar PV Power Project fell 4.6% from 2024 to 2025, from 50,269 MWh to 47,970 MWh.
| Period | MWh |
|---|---|
| 2024 | 50,269 |
| 2025 | 47,970 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 2,046 |
| November 2025 | 2,225 |
| October 2025 | 3,583 |
| September 2025 | 4,010 |
| August 2025 | 4,698 |
| July 2025 | 5,500 |
| June 2025 | 5,518 |
| May 2025 | 5,324 |
| April 2025 | 5,007 |
| March 2025 | 4,141 |
| February 2025 | 3,154 |
| January 2025 | 2,764 |
| December 2024 | 2,375 |
| November 2024 | 2,796 |
| October 2024 | 3,698 |
| September 2024 | 4,492 |
| August 2024 | 5,190 |
| July 2024 | 5,458 |
| June 2024 | 5,859 |
| May 2024 | 6,094 |
| April 2024 | 5,318 |
| March 2024 | 4,030 |
| February 2024 | 2,639 |
| January 2024 | 2,320 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Apex Solar PV Power Project plant, and when do they retire?
1 operable generator totals 20 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Solar Photovoltaic | 20 | 2012 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Apex Solar PV Power Project plant?
Apex Nevada Solar, LLC is the only joint owner reported for Apex Solar PV Power Project, with 100.0%. Southern Power Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Apex Solar PV Power Project plant?
Apex Solar PV Power Project is in North Las Vegas, Clark County, Nevada, at 36.3900° N, 114.9700° W. It sits in the Nevada Power Company balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Nevada are similar in size?
Nevada has 58 operable solar plants with 5,195 MW of capacity, and Apex Solar PV Power Project's 20 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Spectrum Solar PV Power Project | Clark | 30 | 81,819 |
| Techren Solar III LLC | Clark | 25 | 53,970 |
| Techren Solar IV LLC | Clark | 25 | 53,892 |
| Apex Solar PV Power Project | Clark | 20 | 47,970 |
| Mountain View Solar | Clark | 20 | 51,415 |
| Stillwater Solar PV II | Churchill | 20 | 12,238 |
| Ft. Churchill PV | Lyon | 20 | 7,084 |
Source: EIA Forms EIA-860 and EIA-923, 2025.