Techren Solar IV LLC power plant, Nevada

Techren Solar IV LLC is a 25 MW solar power plant in Clark County, Nevada, operated by Techren Solar IV LLC, and it generated 53,892 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Nevada, and its capacity factor sits at the 62nd percentile of U.S. solar plants. By 2025 generation it ranks 4,003rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

25 MWNameplate capacity
25%Capacity factor, 2025, 62nd percentile, on 25 MW net summer
0.1%Of NV generation, 2025
5 yearsAverage generator age, by MW

How hard does the Techren Solar IV LLC plant run compared with other solar plants?

The Techren Solar IV LLC plant had a capacity factor of 25% in 2025 on 25 MW of net summer capacity, the 62nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 90 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Techren Solar IV LLC25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Techren Solar IV LLC plant generating more or less than last year?

Generation at Techren Solar IV LLC fell 6.5% from 2024 to 2025, from 57,636 MWh to 53,892 MWh. Through August 2026 it is running 8.2% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202457,636
202553,892
2026 through August42,941
2025, same months39,675
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20264,826
July 20266,223
June 20266,876
May 20267,475
April 20266,036
March 20264,655
February 20263,696
January 20263,154
December 20252,969
November 20252,893
October 20254,188
September 20254,167
August 20254,810
July 20254,679
June 20256,277
May 20255,564
April 20256,402
March 20255,167
February 20253,397
January 20253,379
December 20242,762
November 20243,182
October 20243,970
September 20245,167
August 20245,746
July 20245,521
June 20246,423
May 20246,747
April 20246,633
March 20245,024
February 20243,596
January 20242,865

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Techren Solar IV LLC plant?

Techren Solar IV LLC made 0.1% of the 45,180,066 MWh reported by Nevada plants in 2025, from 0.1% of the state's 18,959 MW of capacity. By capacity it is the 74th largest of 117 plants in Nevada, the 4,556th largest of 14,327 in the U.S. and the 1,050th largest of 7,223 solar plants. By 2025 generation it is the 77th largest of 112 generating plants in the state.

Techren Solar IV LLC within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)2518,9590.1%
Generation (MWh)53,89245,180,0660.1%
Solar capacity (MW)255,1950.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Techren Solar IV LLC plant, and when do they retire?

1 operable generator totals 25 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s125100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
TECH4OperatingSolar Photovoltaic252020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Techren Solar IV LLC plant?

Kkr/Ga is the only joint owner reported for Techren Solar IV LLC, with 100.0%. Techren Solar IV LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Techren Solar IV LLC plant?

Techren Solar IV LLC is in Boulder, Clark County, Nevada, at 35.8927° N, 114.9365° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Techren Solar IV LLC's 25 MW is 0% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
CM48Clark4889,650
Spectrum Solar PV Power ProjectClark3081,819
Techren Solar III LLCClark2553,970
Techren Solar IV LLCClark2553,892
Apex Solar PV Power ProjectClark2047,970
Mountain View SolarClark2051,415
Stillwater Solar PV IIChurchill2012,238

Source: EIA Forms EIA-860 and EIA-923, 2025.