Skip to main content
RateWatt

Solar power plant, Nevada

Cm48 solar power plant, Nevada

Cm48 is a 48 MW solar power plant in Clark County, Nevada, operated by RWE Clean Energy, and it generated 89,650 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Nevada, and its capacity factor sits at the 35th percentile of U.S. solar plants. By 2025 generation it ranks 3,516th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

48 MWNameplate capacity
21%Capacity factor, 2025, 35th percentile, on 48 MW net summer
0.2%Of NV generation, 2025
15 yearsAverage generator age, by MW

How hard does the Cm48 plant run compared with other solar plants?

The Cm48 plant had a capacity factor of 21% in 2025 on 48 MW of net summer capacity, the 35th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 78 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Cm4821%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Cm48 plant generating more or less than last year?

Generation at Cm48 fell 5.0% from 2024 to 2025, from 94,346 MWh to 89,650 MWh.

Net generation by period
PeriodMWh
202494,346
202589,650
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20254,843
November 20254,785
October 20257,922
September 20257,475
August 20257,644
July 20258,792
June 20258,532
May 20258,537
April 20259,076
March 20258,189
February 20256,925
January 20256,930
December 20245,973
November 20246,808
October 20248,016
September 20248,463
August 20248,570
July 20248,812
June 20249,064
May 20249,942
April 20249,380
March 20247,647
February 20245,982
January 20245,689

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Cm48 plant?

Cm48 made 0.2% of the 45,180,066 MWh reported by Nevada plants in 2025, from 0.3% of the state's 18,959 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 60th largest of 117 plants in Nevada, the 3,894th largest of 14,327 in the U.S. and the 935th largest of 7,223 solar plants. By 2025 generation it is the 61st largest of 112 generating plants in the state.

Cm48 within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)4818,9590.3%
Generation (MWh)89,65045,180,0660.2%
Solar capacity (MW)485,1950.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Cm48 plant, and when do they retire?

5 operable generators total 48 MW, with an average age of 15 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s548100%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV02OperatingSolar Photovoltaic82010n/a
PV03OperatingSolar Photovoltaic102010n/a
PV04OperatingSolar Photovoltaic102010n/a
PV05OperatingSolar Photovoltaic102010n/a
PV06OperatingSolar Photovoltaic102010n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Cm48 plant?

EIA lists no joint owners for Cm48. RWE Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Cm48 plant?

Cm48 is in Boulder City, Clark County, Nevada, at 35.7814° N, 114.9933° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Cm48's 48 MW is 1% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Boulder Solar II, LLCClark50110,547
Luning EnergyMineral50102,129
Techren Solar VClark50107,986
CM48Clark4889,650
Spectrum Solar PV Power ProjectClark3081,819
Techren Solar III LLCClark2553,970
Techren Solar IV LLCClark2553,892

Source: EIA Forms EIA-860 and EIA-923, 2025.