Solar power plant, Nevada

Stillwater Solar PV II power plant, Nevada

Stillwater Solar PV II is a 20 MW solar power plant in Churchill County, Nevada, operated by Ormat Stillwater Solar PV II, LLC, and it generated 12,238 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 6th percentile of U.S. solar plants. By 2025 generation it ranks 5,808th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
7%Capacity factor, 2025, 6th percentile, on 20 MW net summer
5,808thU.S. rank by generation, 2025
7 yearsAverage generator age, by MW

How hard does the Stillwater Solar PV II plant run compared with other solar plants?

The Stillwater Solar PV II plant had a capacity factor of 7% in 2025 on 20 MW of net summer capacity, the 6th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 25 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Stillwater Solar PV II7%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Stillwater Solar PV II plant generating more or less than last year?

Generation at Stillwater Solar PV II fell 49.7% from 2024 to 2025, from 24,345 MWh to 12,238 MWh.

Net generation by period
PeriodMWh
202424,345
202512,238
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20250
November 20250
October 20250
September 20250
August 20250
July 20250
June 20251,878
May 20252,271
April 20252,561
March 20252,099
February 20251,712
January 20251,717
December 20241,380
November 20241,627
October 20242,333
September 20242,372
August 20242,109
July 20242,582
June 20242,606
May 202467
April 20243,104
March 20242,578
February 20241,908
January 20241,679

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Stillwater Solar PV II plant?

Stillwater Solar PV II made 0.0% of the 45,180,066 MWh reported by Nevada plants in 2025, from 0.1% of the state's 18,959 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 79th largest of 117 plants in Nevada, the 4,775th largest of 14,327 in the U.S. and the 1,207th largest of 7,223 solar plants. By 2025 generation it is the 95th largest of 112 generating plants in the state.

Stillwater Solar PV II within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)2018,9590.1%
Generation (MWh)12,23845,180,0660.0%
Solar capacity (MW)205,1950.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Stillwater Solar PV II plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
STWIIOperatingSolar Photovoltaic202018n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Stillwater Solar PV II plant?

Enel Green Power NA, Inc. is the only joint owner reported for Stillwater Solar PV II, with 100.0%. Ormat Stillwater Solar PV II, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Stillwater Solar PV II plant?

Stillwater Solar PV II is in Fallon, Churchill County, Nevada, at 39.5420° N, 118.5601° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Nevada are similar in size?

Nevada has 58 operable solar plants with 5,195 MW of capacity, and Stillwater Solar PV II's 20 MW is 0% of that.

Solar plants in Nevada around this size
PlantCountyMW2025 MWh
Techren Solar IV LLCClark2553,892
Apex Solar PV Power ProjectClark2047,970
Mountain View SolarClark2051,415
Stillwater Solar PV IIChurchill2012,238
Ft. Churchill PVLyon207,084
Searchlight SolarClark1840,658
Nellis Solar PV IIClark155,812

Source: EIA Forms EIA-860 and EIA-923, 2025.