Solar power plant, Virginia
Pleinmont Solar 2 power plant, Virginia
Pleinmont Solar 2 is a 240 MW solar power plant in Spotsylvania County, Virginia, operated by AES Distributed Energy, and it generated 437,148 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Virginia, and its capacity factor sits at the 31st percentile of U.S. solar plants. By 2025 generation it ranks 1,493rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Pleinmont Solar 2 plant run compared with other solar plants?
The Pleinmont Solar 2 plant had a capacity factor of 21% in 2025 on 240 MW of net summer capacity, the 31st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 76 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Pleinmont Solar 2 | 21% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Pleinmont Solar 2 plant generating more or less than last year?
Generation at Pleinmont Solar 2 fell 1.2% from 2024 to 2025, from 442,305 MWh to 437,148 MWh. Through August 2026 it is running 2.3% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 442,305 |
| 2025 | 437,148 |
| 2026 through August | 334,464 |
| 2025, same months | 326,913 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 45,286 |
| July 2026 | 49,345 |
| June 2026 | 54,009 |
| May 2026 | 50,910 |
| April 2026 | 46,811 |
| March 2026 | 38,562 |
| February 2026 | 26,857 |
| January 2026 | 22,684 |
| December 2025 | 17,015 |
| November 2025 | 24,746 |
| October 2025 | 32,856 |
| September 2025 | 35,618 |
| August 2025 | 43,608 |
| July 2025 | 51,919 |
| June 2025 | 50,416 |
| May 2025 | 44,895 |
| April 2025 | 43,121 |
| March 2025 | 42,913 |
| February 2025 | 25,855 |
| January 2025 | 24,186 |
| December 2024 | 17,879 |
| November 2024 | 23,284 |
| October 2024 | 30,490 |
| September 2024 | 32,054 |
| August 2024 | 48,707 |
| July 2024 | 51,908 |
| June 2024 | 57,408 |
| May 2024 | 46,292 |
| April 2024 | 43,172 |
| March 2024 | 39,806 |
| February 2024 | 30,716 |
| January 2024 | 20,589 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Pleinmont Solar 2 plant, and when do they retire?
1 operable generator totals 240 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 240 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PLNM2 | Operating | Solar Photovoltaic | 240 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Pleinmont Solar 2 plant?
EIA lists no joint owners for Pleinmont Solar 2. AES Distributed Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Pleinmont Solar 2 plant?
Pleinmont Solar 2 is in Spotsylvania, Spotsylvania County, Virginia, at 38.2471° N, 77.7862° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Virginia are similar in size?
Virginia has 141 operable solar plants with 5,163 MW of capacity, and Pleinmont Solar 2's 240 MW is 5% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Pleinmont Solar 2 | Spotsylvania | 240 | 437,148 |
| Skipjack Solar Center | Charles City | 175 | 298,427 |
| Highlander Solar Energy Station 1 | Spotsylvania | 165 | 286,818 |
| Cavalier Solar | Isle of Wight | 156 | 301,761 |
Source: EIA Forms EIA-860 and EIA-923, 2025.