Solar power plant, Virginia

Pleinmont Solar 2 power plant, Virginia

Pleinmont Solar 2 is a 240 MW solar power plant in Spotsylvania County, Virginia, operated by AES Distributed Energy, and it generated 437,148 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Virginia, and its capacity factor sits at the 31st percentile of U.S. solar plants. By 2025 generation it ranks 1,493rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

240 MWNameplate capacity
21%Capacity factor, 2025, 31st percentile, on 240 MW net summer
0.4%Of VA generation, 2025
4 yearsAverage generator age, by MW

How hard does the Pleinmont Solar 2 plant run compared with other solar plants?

The Pleinmont Solar 2 plant had a capacity factor of 21% in 2025 on 240 MW of net summer capacity, the 31st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 76 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Pleinmont Solar 221%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Pleinmont Solar 2 plant generating more or less than last year?

Generation at Pleinmont Solar 2 fell 1.2% from 2024 to 2025, from 442,305 MWh to 437,148 MWh. Through August 2026 it is running 2.3% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024442,305
2025437,148
2026 through August334,464
2025, same months326,913
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202645,286
July 202649,345
June 202654,009
May 202650,910
April 202646,811
March 202638,562
February 202626,857
January 202622,684
December 202517,015
November 202524,746
October 202532,856
September 202535,618
August 202543,608
July 202551,919
June 202550,416
May 202544,895
April 202543,121
March 202542,913
February 202525,855
January 202524,186
December 202417,879
November 202423,284
October 202430,490
September 202432,054
August 202448,707
July 202451,908
June 202457,408
May 202446,292
April 202443,172
March 202439,806
February 202430,716
January 202420,589

Source: EIA Form EIA-923, through August 2026.

How much of Virginia's electricity comes from the Pleinmont Solar 2 plant?

Pleinmont Solar 2 made 0.4% of the 106,220,859 MWh reported by Virginia plants in 2025, from 0.8% of the state's 31,312 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 29th largest of 259 plants in Virginia, the 1,316th largest of 14,327 in the U.S. and the 111th largest of 7,223 solar plants. By 2025 generation it is the 23rd largest of 241 generating plants in the state.

Pleinmont Solar 2 within Virginia, 2025
MeasureThis plantVirginiaShare
Capacity (MW)24031,3120.8%
Generation (MWh)437,148106,220,8590.4%
Solar capacity (MW)2405,1634.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Pleinmont Solar 2 plant, and when do they retire?

1 operable generator totals 240 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1240100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PLNM2OperatingSolar Photovoltaic2402021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Pleinmont Solar 2 plant?

EIA lists no joint owners for Pleinmont Solar 2. AES Distributed Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Pleinmont Solar 2 plant?

Pleinmont Solar 2 is in Spotsylvania, Spotsylvania County, Virginia, at 38.2471° N, 77.7862° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Virginia are similar in size?

Virginia has 141 operable solar plants with 5,163 MW of capacity, and Pleinmont Solar 2's 240 MW is 5% of that.

Solar plants in Virginia around this size
PlantCountyMW2025 MWh
Pleinmont Solar 2Spotsylvania240437,148
Skipjack Solar CenterCharles City175298,427
Highlander Solar Energy Station 1Spotsylvania165286,818
Cavalier SolarIsle of Wight156301,761

Source: EIA Forms EIA-860 and EIA-923, 2025.