Highlander Solar Energy Station 1 is a 165 MW solar power plant in Spotsylvania County, Virginia, operated by AES Distributed Energy, and it generated 286,818 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Virginia, and its capacity factor sits at the 25th percentile of U.S. solar plants. By 2025 generation it ranks 2,034th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Highlander Solar Energy Station 1 plant run compared with other solar plants?
The Highlander Solar Energy Station 1 plant had a capacity factor of 20% in 2025 on 165 MW of net summer capacity, the 25th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 72 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Highlander Solar Energy Station 1 | 20% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Highlander Solar Energy Station 1 plant generating more or less than last year?
Generation at Highlander Solar Energy Station 1 fell 3.4% from 2024 to 2025, from 296,839 MWh to 286,818 MWh. Through August 2026 it is running 4.7% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 296,839 |
| 2025 | 286,818 |
| 2026 through August | 225,407 |
| 2025, same months | 215,357 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 30,968 |
| July 2026 | 33,701 |
| June 2026 | 37,438 |
| May 2026 | 32,529 |
| April 2026 | 31,235 |
| March 2026 | 26,397 |
| February 2026 | 18,137 |
| January 2026 | 15,002 |
| December 2025 | 11,324 |
| November 2025 | 16,384 |
| October 2025 | 20,914 |
| September 2025 | 22,839 |
| August 2025 | 27,355 |
| July 2025 | 34,404 |
| June 2025 | 32,949 |
| May 2025 | 30,278 |
| April 2025 | 28,827 |
| March 2025 | 28,295 |
| February 2025 | 17,118 |
| January 2025 | 16,131 |
| December 2024 | 12,262 |
| November 2024 | 15,727 |
| October 2024 | 21,096 |
| September 2024 | 22,075 |
| August 2024 | 32,391 |
| July 2024 | 34,293 |
| June 2024 | 39,158 |
| May 2024 | 31,045 |
| April 2024 | 27,811 |
| March 2024 | 26,531 |
| February 2024 | 20,695 |
| January 2024 | 13,755 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Highlander Solar Energy Station 1 plant, and when do they retire?
1 operable generator totals 165 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 165 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| HLND1 | Operating | Solar Photovoltaic | 165 | 2020 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Highlander Solar Energy Station 1 plant?
EIA lists no joint owners for Highlander Solar Energy Station 1. AES Distributed Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Highlander Solar Energy Station 1 plant?
Highlander Solar Energy Station 1 is in Spotsylvania, Spotsylvania County, Virginia, at 38.2471° N, 77.7862° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Virginia are similar in size?
Virginia has 141 operable solar plants with 5,163 MW of capacity, and Highlander Solar Energy Station 1's 165 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Pleinmont Solar 2 | Spotsylvania | 240 | 437,148 |
| Skipjack Solar Center | Charles City | 175 | 298,427 |
| Highlander Solar Energy Station 1 | Spotsylvania | 165 | 286,818 |
| Cavalier Solar | Isle of Wight | 156 | 301,761 |
| Carvers Creek Solar | Gloucester | 154 | 223,997 |
| Fort Powhatan Solar | Prince George | 150 | 306,961 |
Source: EIA Forms EIA-860 and EIA-923, 2025.