Solar power plant, Virginia
Skipjack Solar Center, Virginia
Skipjack Solar Center is a 175 MW solar power plant in Charles City, Virginia, operated by AES Distributed Energy, and it generated 298,427 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Virginia, and its capacity factor sits at the 22nd percentile of U.S. solar plants. By 2025 generation it ranks 1,980th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Skipjack Solar Center plant run compared with other solar plants?
The Skipjack Solar Center plant had a capacity factor of 19% in 2025 on 175 MW of net summer capacity, the 22nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 71 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Skipjack Solar Center | 19% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Skipjack Solar Center plant generating more or less than last year?
Generation at Skipjack Solar Center fell 13.1% from 2024 to 2025, from 343,381 MWh to 298,427 MWh. Through August 2026 it is running 1.8% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 343,381 |
| 2025 | 298,427 |
| 2026 through August | 235,648 |
| 2025, same months | 231,563 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 35,243 |
| July 2026 | 34,887 |
| June 2026 | 39,315 |
| May 2026 | 37,766 |
| April 2026 | 32,663 |
| March 2026 | 24,871 |
| February 2026 | 16,390 |
| January 2026 | 14,513 |
| December 2025 | 11,994 |
| November 2025 | 17,434 |
| October 2025 | 22,472 |
| September 2025 | 14,964 |
| August 2025 | 31,643 |
| July 2025 | 36,077 |
| June 2025 | 36,432 |
| May 2025 | 32,352 |
| April 2025 | 33,893 |
| March 2025 | 26,370 |
| February 2025 | 16,652 |
| January 2025 | 18,144 |
| December 2024 | 15,317 |
| November 2024 | 17,628 |
| October 2024 | 28,362 |
| September 2024 | 24,863 |
| August 2024 | 36,403 |
| July 2024 | 36,099 |
| June 2024 | 45,894 |
| May 2024 | 36,951 |
| April 2024 | 31,705 |
| March 2024 | 30,390 |
| February 2024 | 23,388 |
| January 2024 | 16,381 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Skipjack Solar Center plant, and when do they retire?
1 operable generator totals 175 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 175 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SKIPJ | Operating | Solar Photovoltaic | 175 | 2022 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Skipjack Solar Center plant?
EIA lists no joint owners for Skipjack Solar Center. AES Distributed Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Skipjack Solar Center plant?
Skipjack Solar Center is in Wayside, Charles City, Virginia, at 37.4371° N, 77.1587° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Virginia are similar in size?
Virginia has 141 operable solar plants with 5,163 MW of capacity, and Skipjack Solar Center's 175 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Pleinmont Solar 2 | Spotsylvania | 240 | 437,148 |
| Skipjack Solar Center | Charles City | 175 | 298,427 |
| Highlander Solar Energy Station 1 | Spotsylvania | 165 | 286,818 |
| Cavalier Solar | Isle of Wight | 156 | 301,761 |
| Carvers Creek Solar | Gloucester | 154 | 223,997 |
Source: EIA Forms EIA-860 and EIA-923, 2025.